FDOT Resurfacing — SR 33 (Polk Co.)
SR 33 FROM CLEARWATER AVE TO S OF HAYNES CIRCLE, Polk County, FL
Score breakdown — 70/100
State-funded project in the 5-Year Work Program — guaranteed funding
Project in early stages — good time to build GC relationships
Road construction requires heavy aggregate, fill, and asphalt hauling
Known companies — contact info available for outreach
AI Summary
This FDOT resurfacing project on SR 33 in Polk County is a public works roadway rehabilitation effort currently in pre-construction review, scheduled for FY2028 delivery. The project presents solid hauling demand for removal of existing pavement, base materials, and construction debris, with potential for aggregate and asphalt deliveries depending on final specifications. Contact Ranger Construction Industries (561-793-9400) as the prime GC to establish early relationships and position for material haul-off and delivery contracts before active construction ramps up.
Location
Exact project coordinates not available — pin shows approximate county-level area
Scope signals
- Project type
- public works
- Work class
- roadway
- Permit types
- FDOT Work Program
- Keywords
- FDOT, RESURFACING, POLK, District 01, FY2028, 45147615202, SR 33 FROM CLEARWATER AVE TO S OF HAYNES CIRCLE
- Jurisdiction
- Polk, FL
Company roles
Ranger Construction Industries, Inc.
http://www.rangerconstruction.com/