FDOT Resurfacing — SR 10 (US 90/MAHAN DR) (Leon Co.)
SR 10 (US 90/MAHAN DR) FROM CR 0353 (DEMPSEYMAYO RD) TO APEX DR, Leon County, FL
Score breakdown — 70/100
State-funded project in the 5-Year Work Program — guaranteed funding
Project in early stages — good time to build GC relationships
Road construction requires heavy aggregate, fill, and asphalt hauling
Known companies — contact info available for outreach
AI Summary
FDOT is resurfacing SR 10 (US 90/Mahan Dr) across ~4 miles in Leon County, FL, with work scheduled for FY2027—a public roadway project requiring significant material haul-off and base prep work. This pre-construction phase presents a strong opportunity for earthwork and asphalt/debris removal services as the project moves toward active construction. Contact **C.W. Roberts Contracting, Inc.** (prime GC, 813-756-2009) now to establish relationships and bid on haul services before competition intensifies.
Location
Exact project coordinates not available — pin shows approximate county-level area
Scope signals
- Project type
- public works
- Work class
- roadway
- Permit types
- FDOT Work Program
- Keywords
- FDOT, RESURFACING, LEON, District 03, FY2027, 45293415201, SR 10 (US 90/MAHAN DR) FROM CR 0353 (DEMPSEYMAYO RD) TO APEX
- Jurisdiction
- Leon, FL
Company roles
C.W. Roberts Contracting, Inc.
https://cwrcontracting.com/asphalt-paving-plant-city-florida/