FDOT Interchange - Add Lanes — I-4 (SR 400) AT SR 33 INTERCHANGE MODIFICATION (Polk Co.)
I-4 (SR 400) AT SR 33 INTERCHANGE MODIFICATION, Polk County, FL
Score breakdown — 95/100
State-funded project in the 5-Year Work Program — guaranteed funding
Active jobsite — hauling work is happening now
Road construction requires heavy aggregate, fill, and asphalt hauling
Contractor data not yet available for this project
AI Summary
The FDOT Interchange project involves adding lanes to the I-4 at the SR 33 interchange in Polk County, FL, and is currently under construction. This project is significant for hauling providers as it requires substantial earthwork, materials transportation, and ongoing demolition efforts, thus offering numerous hauling opportunities. Key contacts for this initiative include the General Contractor, the Florida Department of Transportation (FDOT), and the project's owner representatives.
Location
Exact project coordinates not available — pin shows approximate county-level area
Scope signals
- Project type
- public works
- Work class
- roadway
- Permit types
- FDOT Work Program
- Keywords
- FDOT, INTERCHANGE - ADD LA, POLK, District 01, FY2026, 43018535695, I-4 (SR 400) AT SR 33 INTERCHANGE MODIFICATION
- Jurisdiction
- Polk, FL
Contractor info pending
This project comes from the FDOT Work Program database, which doesn't include contractor names. Once this project appears in an FDOT letting or award, contractor details will be automatically linked.