FDOT Bridge Replacement — SR 10 (US 90) OVER CHIPOLA RIVER BRIDGE NO. 530005 (Jackson Co.)

SR 10 (US 90) OVER CHIPOLA RIVER BRIDGE NO. 530005, Jackson County, FL

Strong 85
HotStrongWarmQualifying
in reviewpublic worksroadway

Score breakdown — 85/100

+
FDOT Work Program

State-funded project in the 5-Year Work Program — guaranteed funding

Pre-Construction

Project in early stages — good time to build GC relationships

+
Roadway Work

Road construction requires heavy aggregate, fill, and asphalt hauling

+
1 Contractor Linked

Known companies — contact info available for outreach

AI Summary

The FDOT Bridge Replacement project on SR 10 (US 90) over Chipola River in Jackson County, FL, involves significant roadway work and is currently in the review stage, with right-of-way acquisitions underway and targeted for FY2027. This project presents substantial hauling opportunities due to the expected requirements for materials, earthwork, and possible demolition during construction. Key contacts for this initiative include the General Contractor and FDOT representatives who oversee the project execution and coordination.

Scope signals

Project type
public works
Work class
roadway
Permit types
FDOT Work Program
Keywords
FDOT, BRIDGE REPLACEMENT, JACKSON, District 03, FY2027, 21934435202, SR 10 (US 90) OVER CHIPOLA RIVER BRIDGE NO. 530005
Jurisdiction
Jackson, FL

Company roles

Source records

fdot_workprogramFDOTWP_21934435202
View on FDOT
FDOT Bridge Replacement — SR 10 (US 90) OVER CHIPOLA RIVER BRIDGE NO. 530005 (Jackson Co.) — Jackson | Hauling Intel