FDOT Bridge Repair/Rehabilitation — SR 5/US 1 LONG KEY BRIDGE OVER LONG KEY CHANNEL MI (Monroe Co.)

SR 5/US 1 LONG KEY BRIDGE OVER LONG KEY CHANNEL MITIGATION, Monroe County, FL

Warm 72
HotStrongWarmQualifying
approvedpublic worksroadway
Contract: E6P26Awarded: Oct 20, 2025To: Seacoast Incorporated

Score breakdown — 72/100

+
FDOT Work Program

State-funded project in the 5-Year Work Program — guaranteed funding

+
Roadway Work

Road construction requires heavy aggregate, fill, and asphalt hauling

+
1 Contractor Linked

Known companies — contact info available for outreach

AI Summary

**FDOT Long Key Bridge Repair/Rehabilitation (SR 5/US 1)** — Monroe County, FL bridge rehab project scheduled for FY2028 with high hauling potential (72/100 score) due to expected structural demolition, concrete removal, aggregate base replacement, and fill material transport typical of bridge rehabilitation work. Early approval stage presents an ideal window to establish relationships before detailed design and material quantification, particularly for marine-accessible debris removal and heavy haul logistics in the Keys environment. Primary contact is **Seacoast Incorporated** as prime GC at (813) 925-3555 — reach out now to position for bid phase material and demolition hauling opportunities.

Scope signals

Project type
public works
Work class
roadway
Permit types
FDOT Work Program
Keywords
FDOT, BRIDGE-REPAIR/REHABI, MONROE, District 06, FY2028, 45588625201, SR 5/US 1 LONG KEY BRIDGE OVER LONG KEY CHANNEL MITIGATION
Jurisdiction
Monroe, FL

Company roles

Source records

fdot_workprogramFDOTWP_45588625201
View on FDOT
FDOT Bridge Repair/Rehabilitation — SR 5/US 1 LONG KEY BRIDGE OVER LONG KEY CHANNEL MI (Monroe Co.) — Monroe | Hauling Intel