FDOT Bridge Repair/Rehabilitation — SR 30 (US 98) OVER NAVY BLVD FLYOVER BRIDGE NO. 46 (Bay Co.)
SR 30 (US 98) OVER NAVY BLVD FLYOVER BRIDGE NO. 460111, Bay County, FL
Score breakdown — 72/100
State-funded project in the 5-Year Work Program — guaranteed funding
Project in early stages — good time to build GC relationships
Road construction requires heavy aggregate, fill, and asphalt hauling
Known companies — contact info available for outreach
AI Summary
FDOT is planning a bridge repair and rehabilitation project on SR 30 (US 98) over Navy Boulevard Flyover in Bay County, FL, with F & W Construction Company as the prime GC—a pre-construction/early-stage public works initiative targeting FY2027. This bridge work will likely generate significant demand for demolition debris removal, concrete and asphalt hauling, and structural material transport as repairs progress. With a strong hauling score of 72/100 and early-stage timing, now is the ideal window to engage F & W Construction and establish relationships before active construction begins.
Scope signals
- Project type
- public works
- Work class
- roadway
- Permit types
- FDOT Work Program
- Keywords
- FDOT, BRIDGE-REPAIR/REHABI, BAY, District 03, FY2027, 45475715201, SR 30 (US 98) OVER NAVY BLVD FLYOVER BRIDGE NO. 460111
- Jurisdiction
- Bay, FL