FDOT Bridge Repair/Rehabilitation — I75 (SR 93A) OVER ALAFIA RIVER BRIDGE REPAIRS (Hillsborough Co.)
I75 (SR 93A) OVER ALAFIA RIVER BRIDGE REPAIRS, Hillsborough County, FL
Score breakdown — 72/100
State-funded project in the 5-Year Work Program — guaranteed funding
Road construction requires heavy aggregate, fill, and asphalt hauling
Known companies — contact info available for outreach
AI Summary
FDOT is planning a bridge repair and rehabilitation project on the I-75 Alafia River Bridge in Hillsborough County, scheduled for FY2030, presenting a significant hauling opportunity for debris removal, concrete demolition, and material haul-offs during the repair phase. With a strong 72/100 hauling score and the project still in early approval stages, this is an ideal time to build relationships with prime contractor Pepper Contracting Services, Inc. (727) 938-9897 before competitive bidding intensifies. Contact Pepper now to position for potential subcontracting or material/waste hauling opportunities on this publicly-funded infrastructure project.
Location
Exact project coordinates not available — pin shows approximate county-level area
Scope signals
- Project type
- public works
- Work class
- roadway
- Permit types
- FDOT Work Program
- Keywords
- FDOT, BRIDGE-REPAIR/REHABI, HILLSBOROUGH, District 07, FY2030, 45474915201, I75 (SR 93A) OVER ALAFIA RIVER BRIDGE REPAIRS
- Jurisdiction
- Hillsborough, FL