FDOT Bridge Repair/Rehabilitation — I275/SR93 NB HOWARDFRANKLAND BRIDGE SUBSTRUCTURE R (Pinellas Co.)
I275/SR93 NB HOWARDFRANKLAND BRIDGE SUBSTRUCTURE REPAIRS, Pinellas County, FL
Score breakdown — 72/100
State-funded project in the 5-Year Work Program — guaranteed funding
Project in early stages — good time to build GC relationships
Road construction requires heavy aggregate, fill, and asphalt hauling
Known companies — contact info available for outreach
AI Summary
**Summary:** This is a Florida Department of Transportation (FDOT) bridge substructure repair/rehabilitation project on the northbound I-275/SR-93 Howardfrankland Bridge in Pinellas County, currently in pre-construction/early-stage review with a FY2027 timeline. The project presents significant hauling opportunities for debris removal, demolition materials, and aggregate/fill delivery associated with bridge substructure work. With a solid 72/100 hauling score and FDOT as the owner, this is an ideal opportunity to establish relationships with the general contractor and prime consultants during the review phase before active construction begins.
Location
Exact project coordinates not available — pin shows approximate county-level area
Scope signals
- Project type
- public works
- Work class
- roadway
- Permit types
- FDOT Work Program
- Keywords
- FDOT, BRIDGE-REPAIR/REHABI, PINELLAS, District 07, FY2027, 43878515201, I275/SR93 NB HOWARDFRANKLAND BRIDGE SUBSTRUCTURE REPAIRS
- Jurisdiction
- Pinellas, FL