FDOT Bridge Repair/Rehabilitation — I275 (HOWARD FRKL) - RESILIENCY MEAUSURES (Hillsborough Co.)
I275 (HOWARD FRKL) - RESILIENCY MEAUSURES, Hillsborough County, FL
Score breakdown — 72/100
State-funded project in the 5-Year Work Program — guaranteed funding
Road construction requires heavy aggregate, fill, and asphalt hauling
Known companies — contact info available for outreach
AI Summary
FDOT Bridge Repair/Rehabilitation project on I-275 (Howard Frankland Bridge) in Hillsborough County focused on resiliency measures—a significant infrastructure initiative with heavy earthwork, demolition, and material hauling requirements. With a high hauling score (72/100) and approved stage status, this project represents strong opportunity for earthmoving and aggregate transport services, particularly given the bridge's critical location and scale. Contact Structural Technologies, LLC (prime GC) at (630) 351-8200 to establish relationships early before construction mobilization in FY2030.
Location
Exact project coordinates not available — pin shows approximate county-level area
Scope signals
- Project type
- public works
- Work class
- roadway
- Permit types
- FDOT Work Program
- Keywords
- FDOT, BRIDGE-REPAIR/REHABI, HILLSBOROUGH, District 07, FY2030, 42290455201, I275 (HOWARD FRKL) - RESILIENCY MEAUSURES
- Jurisdiction
- Hillsborough, FL