FDOT — A (US 1/KING ST) OVER SAN SEBASTIAN RIVER BRIDGE NO...
Score breakdown — 85/100
GC selected — material delivery and earthwork hauling imminent
Road construction requires heavy aggregate, fill, and asphalt hauling
Known companies — contact info available for outreach
AI Summary
The FDOT is currently overseeing a public works project involving the construction of the A (US 1/KING ST) OVER SAN SEBASTIAN RIVER BRIDGE, which is in the roadway development stage and has recently been awarded. This project presents significant hauling opportunities for providers, focusing on earthwork, material transport, and potentially demolition activities as part of the roadway enhancements. Key contacts for this project include J.B. Coxwell Contracting, Inc. as the general contractor, along with other subcontractors such as Kiewit Infrastructure South Co. and Granite Construction Company of California.
Scope signals
- Project type
- public works
- Work class
- roadway
- Keywords
- T2A28, CO, FDOT, letting, roadway, A (US 1/KING ST) OVER SAN SEBASTIAN RIVER BRIDGE NO...
- Jurisdiction
- FL