FDOT — A (US 1/KING ST) OVER SAN SEBASTIAN RIVER BRIDGE NO...

Strong 85
HotStrongWarmQualifying
awarded publicpublic worksroadway
Contract: T2A28Awarded: May 20, 2025To: J.B. Coxwell Contracting, Inc.

Score breakdown — 85/100

+
Contract Awarded

GC selected — material delivery and earthwork hauling imminent

+
Roadway Work

Road construction requires heavy aggregate, fill, and asphalt hauling

+
4 Contractors Linked

Known companies — contact info available for outreach

AI Summary

The FDOT project involves the construction of the US 1/KING STREET over San Sebastian River Bridge in Florida, which is a critical public works roadway development. This $85/100 hauling score highlights a strong demand for hauling services related to earthwork, materials transportation, and potential demolition as part of the roadway construction. Key contacts for this project include J.B. Coxwell Contracting, Inc. as the general contractor with additional subcontractors such as Kiewit Infrastructure South Co. and Granite Construction Company, both of which may require hauling resources.

Scope signals

Project type
public works
Work class
roadway
Keywords
T2A28, CO, FDOT, letting, roadway, A (US 1/KING ST) OVER SAN SEBASTIAN RIVER BRIDGE NO...
Jurisdiction
FL

Company roles