Leads/fcfb4673
Approved · unknownHILLSBOROUGH County

Cleanup (petroleum cleanup) — 7-ELEVEN STORE #37653

10001 N DALE MABRY, TAMPA, FL, 33618

~19loads
fill dirt + base rock
≤1 wk
Lifecycle
Active as of Jun 9, 2026
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Construction underway — hauling demand peaks here

Location

The workspace from above — satellite by default

Cleanup (petroleum cleanup) — 7-ELEVEN STORE #37653

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No recorded value on file
Acreage
0.076 ac
Parcel 0236540010
Est truck loads
Needs site plan parse
Sources seen
12
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant
RADIANT GROUP LLC
Why this is a hauling opportunity: Base site_development/earthwork (65) | stage=under_construction, recent (+10)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-06-10FDEP_CLEANUP_SITES
    Captured FDEP_CLEANUP_87922454 from fdep_cleanup_sites
  2. 2026-06-11HCPA
    Captured HCPA_0236540010_fcfb4673 from hcpa
  3. 2026-06-11FDEP_CLEANUP_SITES
    Captured FDEP_CLEANUP_87942891 from fdep_cleanup_sites
  4. 2026-06-15FDEP_CLEANUP_SITES
    Captured FDEP_CLEANUP_87983756 from fdep_cleanup_sites
  5. 2026-06-19HCPA
    Captured HCPA_0236540010_7467c503 from hcpa
  6. 2026-06-25FDEP_CLEANUP_SITES
    Captured FDEP_CLEANUP_88085801 from fdep_cleanup_sites
  7. 2026-06-26HCPA
    Captured HCPA_0236540010_02f15271 from hcpa
  8. 2026-06-28FDEP_CLEANUP_SITES
    Captured FDEP_CLEANUP_88106196 from fdep_cleanup_sites
  9. 2026-06-29FDEP_CLEANUP_SITES
    Captured FDEP_CLEANUP_88116393 from fdep_cleanup_sites
  10. 2026-07-05HCPA
    Captured HCPA_0236540010_85863262 from hcpa
  11. 2026-07-05HCPA
    Captured HCPA_0236540010_e21fd5df from hcpa
  12. 2026-07-11HCPA
    Captured HCPA_0236540010_dcd4579e from hcpa

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (quarry)
Tampa Cement Grinding Plant · Tampa
One-way
8.1 mi
Round trip
16.3 mi
TypeNameCityOne-wayRT mi
quarryTampa Cement Grinding PlantTampa8.1 mi16.3
quarryCentral State Aggregates LLCZephyrhill17.0 mi34.1
quarryCaloosa MaterialsRuskin23.6 mi47.2
quarryGeorgia Stone Spring Hill QuarryAtlanta 23.9 mi47.9
sand pitCounty Line MineSpring Hill27.4 mi54.8
quarryFour CornersLithia37.8 mi75.5
quarryBrooksville QuarryBrooksville37.7 mi75.4
quarryBrooksville South Cement PlantBrooksville38.1 mi76.1
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Developer
RADIANT GROUP LLC

Permits & Sources

Every connector that's seen this project

Official source-of-truth portal
Hillsborough County Permits
Tampa area permits, inspections, reviews
ConnectorRecord IDCapturedLink
fdep_cleanup_sitesFDEP_CLEANUP_879224542026-06-10Open ↗
hcpaHCPA_0236540010_fcfb46732026-06-11Open ↗
fdep_cleanup_sitesFDEP_CLEANUP_879428912026-06-11Open ↗
fdep_cleanup_sitesFDEP_CLEANUP_879837562026-06-15Open ↗
hcpaHCPA_0236540010_7467c5032026-06-19Open ↗
fdep_cleanup_sitesFDEP_CLEANUP_880858012026-06-25Open ↗
hcpaHCPA_0236540010_02f152712026-06-26Open ↗
fdep_cleanup_sitesFDEP_CLEANUP_881061962026-06-28Open ↗
fdep_cleanup_sitesFDEP_CLEANUP_881163932026-06-29Open ↗
hcpaHCPA_0236540010_858632622026-07-05Open ↗
hcpaHCPA_0236540010_e21fd5df2026-07-05Open ↗
hcpaHCPA_0236540010_dcd4579e2026-07-11Open ↗

Parcel Detail

Hillsborough Property Appraiser

PropertyHCPA
Folio
0236540010
Strap
U-16-28-18-ZZZ-000000-89740.0
Address
10001 N DALE MABRY HWY, TAMPA
Zip
33618
Acreage
0.076 ac
Sq ft
3,299
Homestead
NO
Owner of record
RADIANT GROUP LLC
Last sale
2003-09-30
$1,615,000

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/fcfb4673