Leads/fbab3d1a
Approved · unknownPASCO County

USACE 404 — 3201 BLUFF BLVD. [DOCK]

3201 BLUFF BLVD., HOLIDAY, FL, 34691

~178loads
fill dirt + base rock
≤1 wk
Lifecycle
Permitted as of Jul 12, 2023
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

USACE 404 — 3201 BLUFF BLVD. [DOCK]

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

⚡ Early signal — no contractor on record yet

The permit cleared on 7/12/2023 but no contractor shows on any filing — the haul work has likely not been awarded. Reaching the developer or engineer now beats bidding against a locked-in GC later.

Project value
No recorded value on file
Acreage
0.71 ac
Parcel 23-26-15-0010-00000-0040
Est truck loads
Needs site plan parse
Sources seen
2
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant
AVERETT SAM A & DEETRA J
Why this is a hauling opportunity: Base public_works/earthwork (65) | size signal: ~178 est. loads (+12) | homeowner-scale dock/seawall — capped low | individual owner, residential scale — capped low

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-28FDEP_SPGP
    Captured FDEP_SPGP_0437495-001-EE from fdep_spgp
  2. 2026-06-03PASCOPA
    Captured PASCOPA_23-26-15-0010-00000-0040_fbab3d1a from pascopa

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (sand pit)
County Line Mine · Spring Hill
One-way
20.3 mi
Round trip
40.7 mi
TypeNameCityOne-wayRT mi
sand pitCounty Line MineSpring Hill20.3 mi40.7
quarryGeorgia Stone Spring Hill QuarryAtlanta 21.8 mi43.5
quarryTampa Cement Grinding PlantTampa27.8 mi55.7
quarryCentral State Aggregates LLCZephyrhill29.6 mi59.3
quarryBrooksville QuarryBrooksville33.3 mi66.6
quarryBrooksville South Cement PlantBrooksville34.1 mi68.2
quarryCalcium PlantJacksonville36.7 mi73.5
quarryCaloosa MaterialsRuskin40.5 mi80.9
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Developer
AVERETT SAM A & DEETRA J

Permits & Sources

Every connector that's seen this project

Official source-of-truth portal
Pasco County Permits
New Port Richey / Wesley Chapel Building
ConnectorRecord IDCapturedLink
fdep_spgpFDEP_SPGP_0437495-001-EE2026-05-28Open ↗
pascopaPASCOPA_23-26-15-0010-00000-0040_fbab3d1a2026-06-03Open ↗

Parcel Detail

Pasco County Property Appraiser

PropertyPASCOPA
Folio
23-26-15-0010-00000-0040
Strap
23-26-15-0010-00000-0040
Address
3201 BLUFF BOULEVARD, HOLIDAY
Zip
34691
Acreage
0.71 ac
Sq ft
30,928
Use
Improved
Owner of record
AVERETT SAM A & DEETRA J
Last sale
2021-03-18
$699,900
Appraiser valuation
Just (market)
$747,491

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/fbab3d1a