Leads/fairfield-acres-fl-a79f47da
Approved · unknown

FAIRFIELD ACRES

2206 25TH AVE W, BRADENTON, FL, 34205-4561

Load estimate pending
Lifecycle
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Construction underway — hauling demand peaks here

Location

The workspace from above — satellite by default

FAIRFIELD ACRES

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No recorded value on file
Acreage
Est truck loads
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant
FAIRFIELD ACRES
The story

The Fairfield Acres project is an active site development focused on stormwater management located at 2206 25th Ave W, Bradenton, FL. This project presents significant hauling opportunities for providers due to its active construction stage and strong earthwork signal, indicating a demand for materials and excavation services. Key contacts for this project include the owner-developer, Fairfield Acres, who should be reached out to for hauling partnerships.

Why this is a hauling opportunity: Base site_development/stormwater (40) | individual owner, residential scale — capped low

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-21NPDES_STORMWATER
    Captured FLR20JB68 from npdes_stormwater

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest export sink (landfill)
63RD AVENUE EAST WASTE PROCESSING FACILITY · Bradenton
One-way
4.2 mi
Round trip
8.4 mi
Closest import source (quarry)
Caloosa Materials · Ruskin
One-way
17.8 mi
Round trip
35.6 mi
TypeNameCityOne-wayRT mi
quarryCaloosa MaterialsRuskin17.8 mi35.6
quarryWingate Creek MineLithia28.3 mi56.5
quarryTampa Cement Grinding PlantTampa32.7 mi65.4
quarryFlorida Shell & Fill Company LLCNaples39.7 mi79.4
quarrySouth Pasture MineLithia40.7 mi81.3
quarryFour CornersLithia42.4 mi84.8
quarry4M-31 MineAlva48.1 mi96.2
landfill63RD AVENUE EAST WASTE PROCESSING FACILITYBradenton4.2 mi8.4
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Developer
FAIRFIELD ACRES

Permits & Sources

Every connector that's seen this project

ACTIVEStormwater Construction Notice (NPDES)(NPDES Construction General Permit (CGP))

Filed days before land disturbance begins on sites over 1 acre. One of the strongest 'trucks imminent' signals there is.

ConnectorRecord IDCapturedLink
npdes_stormwaterFLR20JB682026-05-21Open ↗

Parcel Detail

Property records and ownership

Property
City
BRADENTON
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/fairfield-acres-fl-a79f47da