Leads/f93d6287
Approved · unknown

Asphalt Plant — ROADS INC CANTONMENT ASPHALT PLANT

106 Stone Blvd, CANTONMENT, FL, 32533

Load estimate pending
Lifecycle
Completed as of Dec 8, 2014
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Job closed — historical reference only

Location

The workspace from above — satellite by default

Asphalt Plant — ROADS INC CANTONMENT ASPHALT PLANT

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No cost signal yet
Acreage
Est truck loads
Needs site plan parse
Hauling revenue est
@ $120/load
General Contractor

Not yet identified

Developer / Applicant

Not yet identified

Why this is a hauling opportunity: Base unknown/other (20)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-28FDEP_ARMS_FACILITIES
    Captured FDEP_ARMS_7775285 from fdep_arms_facilities

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations — with haul rate suggestions

Closest export sink (landfill)
PERDIDO LANDFILL · Cantonment
One-way
5.6 mi
Round trip
11.3 mi · ~40 min
Rate / load
$110–$140
Closest import source (sand pit)
Devine Pit · CANTONMENT
One-way
4.7 mi
Round trip
9.4 mi · ~25 min
Rate / load
$85–$110
TypeNameCityOne-wayRT mi~CycleRate / load
sand pitDevine PitCANTONMENT4.7 mi9.4~25m$85–$110
sand pitMolino PitCantonment10.0 mi19.9~40m$110–$140
sand pitQuikrete MineMILTON16.8 mi33.7~75m$175–$230
sand pitShortleaf Borrow PitCANTONMENT19.0 mi38.1~75m$175–$230
sand pitRiver Road PitNavarre30.2 mi60.4~100m$230–$290
sand pitG2C Sand MineNiceville47.8 mi95.5~130m$290–$370
landfillPERDIDO LANDFILLCantonment5.6 mi11.3~40m$110–$140
landfillSURREY PIT (PANHANDLE GRADING & PAVING 8 MILE)Pensacola5.8 mi11.6~40m$110–$140
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Rate bands are FL tri-axle dump market (15–20 CY/load), conservative midpoint. Phase 2 will add Mapbox-routed actual drive distance + truck-type/fuel modifiers.

Contact Graph

Who's involved and how

No companies linked yet.

Permits & Sources

Every connector that's seen this project

ConnectorRecord IDCapturedLink
fdep_arms_facilitiesFDEP_ARMS_77752852026-05-28Open ↗

Parcel Detail

Property records and ownership

Property
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
0 chars

/leads/f93d6287