Leads/f8881f6a
Approved · planning

ROBINSON PRESERVE EXPANSION

10350 9TH AVE NW, BRADENTON, FL, 34209

Load estimate pending
Lifecycle
Permitted as of Jun 3, 2022
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

ROBINSON PRESERVE EXPANSION

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No cost signal yet
Acreage
Est truck loads
Needs site plan parse
Hauling revenue est
@ $120/load
General Contractor

Not yet identified

Developer / Applicant
MANATEE COUNTY PARKS AND NATURAL RESOURCES
Why this is a hauling opportunity: Base unknown/other (20) | government/public-authority project (floor 55) | unknown type, no size signal — capped <40

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-24FDEP_ERP
    Captured FDEP_ERP_0328524-008-EM from fdep_erp

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations — with haul rate suggestions

Closest export sink (landfill)
63RD AVENUE EAST WASTE PROCESSING FACILITY · Bradenton
One-way
9.5 mi
Round trip
18.9 mi · ~40 min
Rate / load
$110–$140
Closest import source (quarry)
Caloosa Materials · Ruskin
One-way
19.3 mi
Round trip
38.6 mi · ~75 min
Rate / load
$175–$230
TypeNameCityOne-wayRT mi~CycleRate / load
quarryCaloosa MaterialsRuskin19.3 mi38.6~75m$175–$230
quarryTampa Cement Grinding PlantTampa32.4 mi64.9~100m$230–$290
quarryWingate Creek MineLithia33.4 mi66.8~100m$230–$290
quarryFlorida Shell & Fill Company LLCNaples43.8 mi87.5~130m$290–$370
quarrySouth Pasture MineLithia45.1 mi90.2~130m$290–$370
quarryFour CornersLithia46.1 mi92.2~130m$290–$370
landfill63RD AVENUE EAST WASTE PROCESSING FACILITYBradenton9.5 mi18.9~40m$110–$140
landfillRECOMMUNITY HOLDINGS LP (FKA RRS/FCR)Sarasota12.5 mi25.1~55m$140–$175
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Rate bands are FL tri-axle dump market (15–20 CY/load), conservative midpoint. Phase 2 will add Mapbox-routed actual drive distance + truck-type/fuel modifiers.

Contact Graph

Who's involved and how

Developer
MANATEE COUNTY PARKS AND NATURAL RESOURCES

Permits & Sources

Every connector that's seen this project

ConnectorRecord IDCapturedLink
fdep_erpFDEP_ERP_0328524-008-EM2026-05-24Open ↗

Parcel Detail

Property records and ownership

Property
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
0 chars

/leads/f8881f6a