Leads/f6023c59
Approved · unknownPINELLAS County

USACE 404 — 11760 CAPRI CIRCLE SOUTH; TREASURE ISLAND

11760 CAPRI CIR S, TREASURE ISLAND, FL, 33706

~168loads
fill dirt + base rock
≤1 wk
Lifecycle
Permitted as of Jan 4, 2024
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

USACE 404 — 11760 CAPRI CIRCLE SOUTH; TREASURE ISLAND

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

⚡ Early signal — no contractor on record yet

The permit cleared on 1/4/2024 but no contractor shows on any filing — the haul work has likely not been awarded. Reaching the developer or engineer now beats bidding against a locked-in GC later.

Project value
No recorded value on file
Acreage
0.6718 ac
Parcel 198154
Est truck loads
Needs site plan parse
Sources seen
2
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant
K & D AFFILIATES INC
Why this is a hauling opportunity: Base public_works/earthwork (65) | single-trade residential permit — capped low | government/public-authority project (floor 55)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-28FDEP_SPGP
    Captured FDEP_SPGP_0218861-002-EI from fdep_spgp
  2. 2026-07-05PCPAO
    Captured PCPAO_198154_f6023c59 from pcpao

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest export sink (transfer station)
A & S OIL RECOVERY OF FLORIDA INC · St Petersburg
One-way
4.9 mi
Round trip
9.8 mi
Closest import source (quarry)
Caloosa Materials · Ruskin
One-way
21.2 mi
Round trip
42.3 mi
TypeNameCityOne-wayRT mi
quarryCaloosa MaterialsRuskin21.2 mi42.3
quarryTampa Cement Grinding PlantTampa23.1 mi46.2
quarryCentral State Aggregates LLCZephyrhill41.5 mi83.1
quarryWingate Creek MineLithia44.3 mi88.6
quarryGeorgia Stone Spring Hill QuarryAtlanta 45.5 mi91
sand pitCounty Line MineSpring Hill47.0 mi93.9
quarryFour CornersLithia49.2 mi98.4
transfer stationA & S OIL RECOVERY OF FLORIDA INCSt Petersburg4.9 mi9.8
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Developer
K & D AFFILIATES INC

Permits & Sources

Every connector that's seen this project

Official source-of-truth portal
Pinellas County Permits
St. Pete / Clearwater ePlans & applications
ConnectorRecord IDCapturedLink
fdep_spgpFDEP_SPGP_0218861-002-EI2026-05-28Open ↗
pcpaoPCPAO_198154_f6023c592026-07-05Open ↗

Parcel Detail

Pinellas County Property Appraiser

PropertyPCPAO
Folio
198154
Strap
14-31-15-13248-005-0040
Address
11760 Capri Cir S
Zip
33706
Acreage
0.6718 ac
Sq ft
29,264
Year built
1973
Use
0311 Apartments (10 ...
Subdivision
CAPRI ISLE SUB
Owner of record
K & D AFFILIATES INC
Last sale
2017-11-01
$2,650,000
Appraiser valuation
Just (market)
$2,275,000
Assessed
$2,275,000
Taxable
$2,275,000

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/f6023c59