Approved · unknownLevy County
FDOT — SR55(US19) AT SR121 - INTERSECTION IMPROVEMENT
Levy County — FDOT Contract E21B5
Load estimate pending
Lifecycle
Active as of Sep 15, 2025
- Filed
- Permitted
- Active
- Completed
Construction underway — hauling demand peaks here
Location
The workspace from above — satellite by default
FDOT — SR55(US19) AT SR121 - INTERSECTION IMPROVEMENT
My Pipeline
Tag this lead — private to you, builds your bid history over time
Loading pipeline status…
Summary
Key numbers at a glance
Project value
$47.5M
Actual — from source record
Acreage
—
Est truck loads
—
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor
Not yet identified
Developer / Applicant
Not yet identified
Why this is a hauling opportunity: FDOT roadway contract — SR55(US19) AT SR121 - INTERSECTION IMPROVEMENT. Vendor: ANDERSON COLUMBIA CO., INC.. Cost: $47,499,999. | FDOT public project (+15) | size signal: $47,499,999 valuation (+20) | stage=under_construction, recent (+10) | FDOT public project (+15) | size signal: $47,499,999 valuation (+20) | stage=under_construction, recent (+10) | FDOT public project (+15) | size signal: $47,499,999 valuation (+20) | stage=under_construction, recent (+10) | FDOT public project (+15) | size signal: $47,499,999 valuation (+20) | stage=under_construction, recent (+10)
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-28FDOT_ACTIVECaptured FDOT_ACTIVE_E21B5_7 from fdot_active
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
Closest import source (quarry)
Inglis Quarry · Brooksville
One-way
10.3 mi
Round trip
20.5 mi
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | Inglis Quarry | Brooksville | 10.3 mi | 20.5 |
| quarry | Red Level Mine | Crystal River | 13.8 mi | 27.5 |
| quarry | 328 Pit | Ocala | 16.7 mi | 33.4 |
| quarry | Amrize Crystal River Quarry | CRYSTAL RIVER | 18.3 mi | 36.7 |
| quarry | Levy County Pit | Bronson | 20.1 mi | 40.1 |
| quarry | Manko Co Sec 5 Mine/Phos | Ocala | 21.0 mi | 41.9 |
| quarry | RALEIGH QUARRY | WILLISTON | 21.0 mi | 41.9 |
| quarry | Maylen Mine | Crystal River | 22.0 mi | 43.9 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
No companies linked yet.
Permits & Sources
Every connector that's seen this project
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| fdot_active | FDOT_ACTIVE_E21B5_7 | 2026-05-28 | Open ↗ |
Parcel Detail
Property records and ownership
Property
- County
- Levy
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)
Site Plan & Engineering
Linked documents
No site plan documents yet. (PDF extraction connector pending.)
Bid Data
Who bid, who won
No bid data. (Public bid connectors pending.)
Activity & Notes
Your internal log
Loading notes…
Log call:
0 chars
/leads/f5c425b6