Leads/f5bdce96
Approved · unknownPINELLAS County

USACE 404 — SOULLIERE DREDGE

601 79TH CIR S, SAINT PETERSBURG, FL, 33707

~52loads
fill dirt + base rock
≤1 wk
Lifecycle
Permitted as of Dec 8, 2025
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

USACE 404 — SOULLIERE DREDGE

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

⚡ Early signal — no contractor on record yet

The permit cleared on 12/8/2025 but no contractor shows on any filing — the haul work has likely not been awarded. Reaching the developer or engineer now beats bidding against a locked-in GC later.

Project value
No recorded value on file
Acreage
0.208 ac
Parcel 329748
Est truck loads
Needs site plan parse
Sources seen
2
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant
SOULLIERE, GRANT
Why this is a hauling opportunity: Base public_works/earthwork (65) | stage=permit_issued, recent (+10) | individual owner, residential scale — capped low

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-28FDEP_SPGP
    Captured FDEP_SPGP_0465751-001-EE from fdep_spgp
  2. 2026-07-05PCPAO
    Captured PCPAO_329748_f5bdce96 from pcpao

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (quarry)
Caloosa Materials · Ruskin
One-way
19.3 mi
Round trip
38.5 mi
TypeNameCityOne-wayRT mi
quarryCaloosa MaterialsRuskin19.3 mi38.5
quarryTampa Cement Grinding PlantTampa22.1 mi44.3
quarryCentral State Aggregates LLCZephyrhill41.1 mi82.2
quarryWingate Creek MineLithia42.3 mi84.7
quarryGeorgia Stone Spring Hill QuarryAtlanta 45.8 mi91.7
quarryFour CornersLithia47.5 mi95
sand pitCounty Line MineSpring Hill47.5 mi95
quarrySouth Pasture MineLithia49.6 mi99.2
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Developer
SOULLIERE, GRANT

Permits & Sources

Every connector that's seen this project

Official source-of-truth portal
Pinellas County Permits
St. Pete / Clearwater ePlans & applications
ConnectorRecord IDCapturedLink
fdep_spgpFDEP_SPGP_0465751-001-EE2026-05-28Open ↗
pcpaoPCPAO_329748_f5bdce962026-07-05Open ↗

Parcel Detail

Pinellas County Property Appraiser

PropertyPCPAO
Folio
329748
Strap
24-31-15-84078-000-0030
Address
601 79th Cir S
Zip
33707
Acreage
0.208 ac
Sq ft
9,060
Year built
1973
Use
0110 Single Family ...
Subdivision
<span title="SOUTH CAUSEWAY ISLE 4TH ADD PART REP">South Causeway Isle ...</span>
Owner of record
SOULLIERE, GRANT
Last sale
2023-07-01
$1,100,000
Appraiser valuation
Just (market)
$711,776
Assessed
$711,776
Taxable
$661,054

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/f5bdce96