Leads/f57be0e8
Approved · unknownPolk County

FDOT — SR 600 (US-92/US-17) FROM W OF RAMONA AVE TO 3RD ST - PAVEME NT ONLY RESURFACE (FLEX)

Polk County — FDOT Contract E1X69

Load estimate pending
Lifecycle
Active as of Nov 19, 2025
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Construction underway — hauling demand peaks here

Location

The workspace from above — satellite by default

FDOT — SR 600 (US-92/US-17) FROM W OF RAMONA AVE TO 3RD ST - PAVEME NT ONLY RESURFACE (FLEX)

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
$7.8M
Actual — from source record
Acreage
Est truck loads
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant

Not yet identified

Why this is a hauling opportunity: FDOT roadway contract — SR 600 (US-92/US-17) FROM W OF RAMONA AVE TO 3RD ST - PAVEME NT ONLY RESURFACE (. Vendor: HUBBARD CONSTRUCTION COMPANY. Cost: $7,806,036. | FDOT public project (+15) | size signal: $7,806,036 valuation (+20) | stage=under_construction, recent (+10) | FDOT public project (+15) | size signal: $7,806,036 valuation (+20) | stage=under_construction, recent (+10) | FDOT public project (+15) | size signal: $7,806,036 valuation (+20) | stage=under_construction, recent (+10) | FDOT public project (+15) | size signal: $7,806,036 valuation (+20) | stage=under_construction, recent (+10)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-28FDOT_ACTIVE
    Captured FDOT_ACTIVE_E1X69_1 from fdot_active

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (sand pit)
Haines City Mine · Davenport
One-way
5.6 mi
Round trip
11.2 mi
TypeNameCityOne-wayRT mi
sand pitHaines City MineDavenport5.6 mi11.2
sand pitSILICA PLANTDavenport7.0 mi14
sand pitDavenport Sand MineBrooksville7.2 mi14.5
quarryFLINT PLANTDavenport7.8 mi15.5
sand pitGator Sand MineBrooksville10.3 mi20.7
sand pitCypress SandLexington13.8 mi27.6
sand pitGreen Bay MineDavenport14.3 mi28.6
sand pitLake Wales Sand MineBrooksville17.1 mi34.3
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

No companies linked yet.

Permits & Sources

Every connector that's seen this project

Official source-of-truth portal
Polk County Permits
Lakeland / Winter Haven permit search
ConnectorRecord IDCapturedLink
fdot_activeFDOT_ACTIVE_E1X69_12026-05-28Open ↗

Parcel Detail

Property records and ownership

Property
County
Polk
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/f57be0e8