Leads/f4adab5d
Approved · application_filed

TYLER OLSON - FLOATING DOCK

9309 9TH AVENUE NW, BRADENTON, FL, 34209

Load estimate pending
Lifecycle
Filed as of Sep 9, 2025
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Paperwork in — not yet approved

Location

The workspace from above — satellite by default

TYLER OLSON - FLOATING DOCK

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No cost signal yet
Acreage
Est truck loads
Needs site plan parse
Hauling revenue est
@ $120/load
General Contractor

Not yet identified

Developer / Applicant
PETER ANDERSON
Why this is a hauling opportunity: Base unknown/other (20) | homeowner-scale dock/seawall — capped low | individual owner, residential scale — capped low

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-24FDEP_ERP
    Captured FDEP_ERP_0254575-004 from fdep_erp

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations — with haul rate suggestions

Closest export sink (landfill)
63RD AVENUE EAST WASTE PROCESSING FACILITY · Bradenton
One-way
8.6 mi
Round trip
17.2 mi · ~40 min
Rate / load
$110–$140
Closest import source (quarry)
Caloosa Materials · Ruskin
One-way
19.0 mi
Round trip
38.1 mi · ~75 min
Rate / load
$175–$230
TypeNameCityOne-wayRT mi~CycleRate / load
quarryCaloosa MaterialsRuskin19.0 mi38.1~75m$175–$230
quarryWingate Creek MineLithia32.6 mi65.2~100m$230–$290
quarryTampa Cement Grinding PlantTampa32.5 mi65~100m$230–$290
quarryFlorida Shell & Fill Company LLCNaples43.1 mi86.1~130m$290–$370
quarrySouth Pasture MineLithia44.4 mi88.9~130m$290–$370
quarryFour CornersLithia45.6 mi91.2~130m$290–$370
landfill63RD AVENUE EAST WASTE PROCESSING FACILITYBradenton8.6 mi17.2~40m$110–$140
landfillRECOMMUNITY HOLDINGS LP (FKA RRS/FCR)Sarasota11.7 mi23.5~55m$140–$175
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Rate bands are FL tri-axle dump market (15–20 CY/load), conservative midpoint. Phase 2 will add Mapbox-routed actual drive distance + truck-type/fuel modifiers.

Contact Graph

Who's involved and how

Developer
PETER ANDERSON

Permits & Sources

Every connector that's seen this project

ConnectorRecord IDCapturedLink
fdep_erpFDEP_ERP_0254575-0042026-05-24Open ↗

Parcel Detail

Property records and ownership

Property
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
0 chars

/leads/f4adab5d