Mitigation bank — Manatee (2,048 ac)
Manatee, MANATEE County, FL
- Filed
- Permitted
- Active
- Completed
Paperwork in — not yet approved
Location
The workspace from above — satellite by default
My Pipeline
Tag this lead — private to you, builds your bid history over time
Summary
Key numbers at a glance
The permit cleared on 1/25/2019 but no contractor shows on any filing — the haul work has likely not been awarded. Reaching the developer or engineer now beats bidding against a locked-in GC later.
Not yet identified
Not yet identified
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-28FDEP_MITIGATION_BANKSCaptured FDEP_MITBANK_43043384 from fdep_mitigation_banks
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | Wingate Creek Mine | Lithia | 6.9 mi | 13.7 |
| quarry | South Pasture Mine | Lithia | 16.9 mi | 33.8 |
| quarry | Caloosa Materials | Ruskin | 17.1 mi | 34.2 |
| quarry | Four Corners | Lithia | 20.0 mi | 40 |
| quarry | South Fort Meade Mine | Lithia | 28.3 mi | 56.7 |
| quarry | Tampa Cement Grinding Plant | Tampa | 29.4 mi | 58.8 |
| quarry | 4M-31 Mine | Alva | 32.4 mi | 64.9 |
| quarry | Florida Shell & Fill Company LLC | Naples | 43.7 mi | 87.4 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
Permits & Sources
Every connector that's seen this project
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| fdep_mitigation_banks | FDEP_MITBANK_43043384 | 2026-05-28 | Open ↗ |
Parcel Detail
Property records and ownership
- County
- MANATEE
Site Plan & Engineering
Linked documents
Bid Data
Who bid, who won
Activity & Notes
Your internal log
/leads/f4316f15