Leads/f3bd8e0f
Approved · unknownMarion County

FDOT — I-75 IMPROVEMENTS FROM SOUTH OF S.R.44 TO S.R. 200 - ADD AUX ILIARY LANE(S)

Marion County — FDOT Contract E54F4

Load estimate pending
Lifecycle
Active as of Oct 11, 2024
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Construction underway — hauling demand peaks here

Location

The workspace from above — satellite by default

FDOT — I-75 IMPROVEMENTS FROM SOUTH OF S.R.44 TO S.R. 200 - ADD AUX ILIARY LANE(S)

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
$29.3M
Actual — from source record
Acreage
Est truck loads
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant

Not yet identified

Why this is a hauling opportunity: FDOT roadway contract — I-75 IMPROVEMENTS FROM SOUTH OF S.R.44 TO S.R. 200 - ADD AUX ILIARY LANE(S). Vendor: ANDERSON COLUMBIA CO., INC.. Cost: $29,286,335. | FDOT public project (+15) | size signal: $29,286,335 valuation (+20) | stage=under_construction, recent (+10) | FDOT public project (+15) | size signal: $29,286,335 valuation (+20) | stage=under_construction, recent (+10) | FDOT public project (+15) | size signal: $29,286,335 valuation (+20) | stage=under_construction, recent (+10) | FDOT public project (+15) | size signal: $29,286,335 valuation (+20) | stage=under_construction, recent (+10)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-28FDOT_ACTIVE
    Captured FDOT_ACTIVE_E54F4_2 from fdot_active

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (quarry)
SUMTERVILLE QUARRY · Ocala
One-way
11.2 mi
Round trip
22.4 mi
TypeNameCityOne-wayRT mi
quarrySUMTERVILLE QUARRYOcala11.2 mi22.4
quarrySUMTERVILLE MINEOcala12.1 mi24.1
quarrySumterville Cement PlantSumterville12.1 mi24.1
quarrySt Catherine MineBrooksville14.7 mi29.5
quarryNORTH MINEOCALA14.9 mi29.7
sand pitWeirsdale Sand PlantJacksonville15.9 mi31.7
quarryManko Co Sec 5 Mine/PhosOcala17.8 mi35.6
sand pitOkahumpkaLeesburg18.1 mi36.2
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

No companies linked yet.

Permits & Sources

Every connector that's seen this project

Official source-of-truth portal
Marion County Permits
Ocala Building & Zoning Department
ConnectorRecord IDCapturedLink
fdot_activeFDOT_ACTIVE_E54F4_22026-05-28Open ↗

Parcel Detail

Property records and ownership

Property
County
Marion
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/f3bd8e0f