Approved · unknown
Dune Beach Structure — Nourishment (Sarasota County)
Midnight Pass
Load estimate pending
Lifecycle
Filed as of Apr 12, 1988
- Filed
- Permitted
- Active
- Completed
Paperwork in — not yet approved
Location
The workspace from above — satellite by default
Dune Beach Structure — Nourishment (Sarasota County)
My Pipeline
Tag this lead — private to you, builds your bid history over time
Loading pipeline status…
Summary
Key numbers at a glance
Project value
—
No recorded value on file
Acreage
—
Est truck loads
—
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor
Not yet identified
Developer / Applicant
Not yet identified
Why this is a hauling opportunity: FDEP coastal permit (dune_beach_structure) — Nourishment. Coastal armor / sand / fill projects typically move 10K-1M+ cy. | government/public-authority project (floor 55) | government/public-authority project (floor 55) | government/public-authority project (floor 55) | government/public-authority project (floor 55)
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-28FDEP_COASTAL_ENVCaptured FDEP_COASTAL_ENV_-DBS880216 from fdep_coastal_env
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
Closest import source (quarry)
Florida Shell & Fill Company LLC · Naples
One-way
21.2 mi
Round trip
42.3 mi
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | Florida Shell & Fill Company LLC | Naples | 21.2 mi | 42.3 |
| quarry | Wingate Creek Mine | Lithia | 31.0 mi | 62 |
| quarry | Caloosa Materials | Ruskin | 34.1 mi | 68.2 |
| sand pit | Washington Loop Mine | Punta Gorda | 38.6 mi | 77.3 |
| quarry | 4M-31 Mine | Alva | 40.1 mi | 80.1 |
| quarry | Bermont Materials Alico | Punta Gorda | 40.3 mi | 80.5 |
| quarry | South Pasture Mine | Lithia | 45.8 mi | 91.6 |
| sand pit | Watermelon Pit | Punta Gorda | 48.4 mi | 96.8 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
No companies linked yet.
Permits & Sources
Every connector that's seen this project
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| fdep_coastal_env | FDEP_COASTAL_ENV_-DBS880216 | 2026-05-28 | Open ↗ |
Parcel Detail
Property records and ownership
Property
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)
Site Plan & Engineering
Linked documents
No site plan documents yet. (PDF extraction connector pending.)
Bid Data
Who bid, who won
No bid data. (Public bid connectors pending.)
Activity & Notes
Your internal log
Loading notes…
Log call:
0 chars
/leads/f14af291