Approved · unknownHILLSBOROUGH County
Cleanup (petroleum cleanup) — PLANT CITY TACO BELL
2101 W BAKER ST, PLANT CITY, FL, 33657
~33loads
fill dirt + base rock
≤1 wk
Lifecycle
Active as of Jun 15, 2026
- Filed
- Permitted
- Active
- Completed
Construction underway — hauling demand peaks here
Location
The workspace from above — satellite by default
Cleanup (petroleum cleanup) — PLANT CITY TACO BELL
My Pipeline
Tag this lead — private to you, builds your bid history over time
Loading pipeline status…
Summary
Key numbers at a glance
Project value
—
No recorded value on file
Acreage
0.132 ac
Parcel 2042910000
Est truck loads
—
Needs site plan parse
Sources seen
4
Public records referencing this job
Why this is a hauling opportunity: FDEP petroleum cleanup site — active remediation. Active cleanups typically require contaminated-soil hauling to disposal.
Lifecycle Timeline
Every signal we've seen, in order
- 2026-06-15FDEP_CLEANUP_SITESCaptured FDEP_CLEANUP_87986250 from fdep_cleanup_sites
- 2026-06-21HCPACaptured HCPA_2042910000_f0e3f626 from hcpa
- 2026-06-25FDEP_CLEANUP_SITESCaptured FDEP_CLEANUP_88088289 from fdep_cleanup_sites
- 2026-06-26HCPACaptured HCPA_2042910000_1662ee54 from hcpa
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
Closest import source (quarry)
Central State Aggregates LLC · Zephyrhill
One-way
15.8 mi
Round trip
31.6 mi
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | Central State Aggregates LLC | Zephyrhill | 15.8 mi | 31.6 |
| quarry | Tampa Cement Grinding Plant | Tampa | 19.1 mi | 38.1 |
| quarry | Four Corners | Lithia | 20.5 mi | 41.1 |
| quarry | Caloosa Materials | Ruskin | 28.3 mi | 56.6 |
| quarry | South Pasture Mine | Lithia | 28.4 mi | 56.8 |
| sand pit | Gator Sand Mine | Brooksville | 32.7 mi | 65.5 |
| quarry | Georgia Stone Spring Hill Quarry | Atlanta | 33.0 mi | 66 |
| sand pit | Green Bay Mine | Davenport | 33.0 mi | 66 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
Permits & Sources
Every connector that's seen this project
Official source-of-truth portal
Hillsborough County Permits ↗Tampa area permits, inspections, reviews
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| fdep_cleanup_sites | FDEP_CLEANUP_87986250 | 2026-06-15 | Open ↗ |
| hcpa | HCPA_2042910000_f0e3f626 | 2026-06-21 | Open ↗ |
| fdep_cleanup_sites | FDEP_CLEANUP_88088289 | 2026-06-25 | Open ↗ |
| hcpa | HCPA_2042910000_1662ee54 | 2026-06-26 | Open ↗ |
Parcel Detail
Hillsborough Property Appraiser
PropertyHCPA ↗
- Folio
- 2042910000
- Strap
- P-30-28-22-58K-000004-00000.7
- Address
- 2101 W BAKER ST, PLANT CITY
- Zip
- 33563
- Acreage
- 0.132 ac
- Sq ft
- 5,758
- Homestead
- NO
Owner of record
HEGU 2 LLC
Last sale
2022-03-21
$3,095,200
Site Plan & Engineering
Linked documents
No site plan documents yet. (PDF extraction connector pending.)
Bid Data
Who bid, who won
No bid data. (Public bid connectors pending.)
Activity & Notes
Your internal log
Loading notes…
Log call:
0 chars
/leads/f0e3f626