Approved · unknownPINELLAS County

USACE 404 — 998 EAST SHORE DRIVE, OLDSMAR

998 EAST SHORE DRIVE, OLDSMAR, FL, 34677

Load estimate pending
Lifecycle
Permitted as of Dec 19, 2014
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

USACE 404 — 998 EAST SHORE DRIVE, OLDSMAR

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No cost signal yet
Acreage
Est truck loads
Needs site plan parse
Hauling revenue est
@ $120/load
General Contractor

Not yet identified

Developer / Applicant

Not yet identified

Why this is a hauling opportunity: Base public_works/earthwork (65) | stage=permit_issued, but stale (11y old) | individual owner, residential scale — capped low

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-28FDEP_SPGP
    Captured FDEP_SPGP_0266409-002-EE from fdep_spgp

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations — with haul rate suggestions

Closest import source (quarry)
Tampa Cement Grinding Plant · Tampa
One-way
14.1 mi
Round trip
28.1 mi · ~55 min
Rate / load
$140–$175
TypeNameCityOne-wayRT mi~CycleRate / load
quarryTampa Cement Grinding PlantTampa14.1 mi28.1~55m$140–$175
quarryCaloosa MaterialsRuskin24.6 mi49.3~75m$175–$230
quarryCentral State Aggregates LLCZephyrhill26.3 mi52.5~100m$230–$290
quarryGeorgia Stone Spring Hill QuarryAtlanta 28.5 mi57~100m$230–$290
sand pitCounty Line MineSpring Hill30.3 mi60.5~100m$230–$290
quarryBrooksville QuarryBrooksville42.3 mi84.6~130m$290–$370
quarryBrooksville South Cement PlantBrooksville42.8 mi85.7~130m$290–$370
quarryFour CornersLithia45.2 mi90.4~130m$290–$370
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Rate bands are FL tri-axle dump market (15–20 CY/load), conservative midpoint. Phase 2 will add Mapbox-routed actual drive distance + truck-type/fuel modifiers.

Contact Graph

Who's involved and how

No companies linked yet.

Permits & Sources

Every connector that's seen this project

Official source-of-truth portal
Pinellas County Permits
St. Pete / Clearwater ePlans & applications
ConnectorRecord IDCapturedLink
fdep_spgpFDEP_SPGP_0266409-002-EE2026-05-28Open ↗

Parcel Detail

Property records and ownership

Property
County
PINELLAS
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)