Leads/ee53325e
Approved · planning

HAPTON INN DUNEDIN

2641 MICHAEL PL, DUNEDIN, FL, 34698

Load estimate pending
Lifecycle
Permitted as of Oct 11, 2017
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

HAPTON INN DUNEDIN

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No cost signal yet
Acreage
Est truck loads
Needs site plan parse
Hauling revenue est
@ $120/load
General Contractor

Not yet identified

Developer / Applicant
FRONTIER ENGINEERING INC
Why this is a hauling opportunity: Base unknown/other (20) | stage=permit_issued, but stale (8y old)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-21FDEP_ERP
    Captured FDEP_ERP_0358013-001-EG from fdep_erp

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations — with haul rate suggestions

Closest import source (quarry)
Tampa Cement Grinding Plant · Tampa
One-way
22.3 mi
Round trip
44.5 mi · ~75 min
Rate / load
$175–$230
TypeNameCityOne-wayRT mi~CycleRate / load
quarryTampa Cement Grinding PlantTampa22.3 mi44.5~75m$175–$230
quarryGeorgia Stone Spring Hill QuarryAtlanta 29.3 mi58.6~100m$230–$290
sand pitCounty Line MineSpring Hill29.4 mi58.8~100m$230–$290
quarryCentral State Aggregates LLCZephyrhill31.6 mi63.1~100m$230–$290
quarryCaloosa MaterialsRuskin31.9 mi63.7~100m$230–$290
quarryBrooksville QuarryBrooksville42.2 mi84.4~130m$290–$370
quarryBrooksville South Cement PlantBrooksville42.9 mi85.9~130m$290–$370
quarryCalcium PlantJacksonville45.8 mi91.7~130m$290–$370
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Rate bands are FL tri-axle dump market (15–20 CY/load), conservative midpoint. Phase 2 will add Mapbox-routed actual drive distance + truck-type/fuel modifiers.

Contact Graph

Who's involved and how

Developer
FRONTIER ENGINEERING INC

Permits & Sources

Every connector that's seen this project

ConnectorRecord IDCapturedLink
fdep_erpFDEP_ERP_0358013-001-EG2026-05-21Open ↗

Parcel Detail

Property records and ownership

Property
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
0 chars

/leads/ee53325e