Approved · unknown
Ready Mix Concrete Plant — MAIN SITE, PLANT #2
3008 Highway 95A, CANTONMENT, FL, 32533
Load estimate pending
Lifecycle
- Filed
- Permitted
- Active
- Completed
Job closed — historical reference only
Location
The workspace from above — satellite by default
Ready Mix Concrete Plant — MAIN SITE, PLANT #2
My Pipeline
Tag this lead — private to you, builds your bid history over time
Loading pipeline status…
Summary
Key numbers at a glance
Project value
—
No recorded value on file
Acreage
—
Est truck loads
—
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor
Not yet identified
Developer / Applicant
Not yet identified
Why this is a hauling opportunity: Ready Mix Concrete Plant INACTIVE (shutdown unknown). | individual owner, residential scale — capped low | individual owner, residential scale — capped low | individual owner, residential scale — capped low
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-28FDEP_ARMS_FACILITIESCaptured FDEP_ARMS_0330063 from fdep_arms_facilities
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
Closest export sink (landfill)
SURREY PIT (PANHANDLE GRADING & PAVING 8 MILE) · Pensacola
One-way
3.7 mi
Round trip
7.3 mi
Closest import source (sand pit)
Devine Pit · CANTONMENT
One-way
4.7 mi
Round trip
9.3 mi
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| sand pit | Devine Pit | CANTONMENT | 4.7 mi | 9.3 |
| sand pit | Molino Pit | Cantonment | 14.2 mi | 28.4 |
| sand pit | Quikrete Mine | MILTON | 14.4 mi | 28.7 |
| sand pit | Shortleaf Borrow Pit | CANTONMENT | 23.4 mi | 46.9 |
| sand pit | River Road Pit | Navarre | 26.4 mi | 52.8 |
| sand pit | G2C Sand Mine | Niceville | 46.0 mi | 92 |
| landfill | SURREY PIT (PANHANDLE GRADING & PAVING 8 MILE) | Pensacola | 3.7 mi | 7.3 |
| landfill | LONGLEAF C&D DISPOSAL FACILITY | Pensacola | 5.0 mi | 10 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
No companies linked yet.
Permits & Sources
Every connector that's seen this project
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| fdep_arms_facilities | FDEP_ARMS_0330063 | 2026-05-28 | Open ↗ |
Parcel Detail
Property records and ownership
Property
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)
Site Plan & Engineering
Linked documents
No site plan documents yet. (PDF extraction connector pending.)
Bid Data
Who bid, who won
No bid data. (Public bid connectors pending.)
Activity & Notes
Your internal log
Loading notes…
Log call:
0 chars
/leads/ed6deed7