Leads/ebc04da8
Approved · application_filedHillsborough County

Residential Utility Application

5211 S Jules Verne Ct T 33611

~2loads
fill dirt
≤1 wk
Lifecycle
Permitted as of May 19, 2026
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

Residential Utility Application

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No cost signal yet
Acreage
0.018 ac
Parcel 1357030022
Est truck loads
Needs site plan parse
Hauling revenue est
@ $120/load
General Contractor

Not yet identified

Developer / Applicant
HIGH POINT REAL ESTATE LLC
Why this is a hauling opportunity: Base unknown/other (20)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-20TAMPA_ACCELA
    Captured UTL-26-0001299 from tampa_accela
  2. 2026-05-21HCPA
    Captured HCPA_1357030022_ebc04da8 from hcpa

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations — with haul rate suggestions

Closest import source (quarry)
Tampa Cement Grinding Plant · Tampa
One-way
4.2 mi
Round trip
8.4 mi · ~25 min
Rate / load
$85–$110
TypeNameCityOne-wayRT mi~CycleRate / load
quarryTampa Cement Grinding PlantTampa4.2 mi8.4~25m$85–$110
quarryCaloosa MaterialsRuskin13.1 mi26.2~55m$140–$175
quarryCentral State Aggregates LLCZephyrhill24.7 mi49.3~75m$175–$230
quarryFour CornersLithia32.6 mi65.2~100m$230–$290
quarryGeorgia Stone Spring Hill QuarryAtlanta 34.4 mi68.7~100m$230–$290
quarryWingate Creek MineLithia34.9 mi69.7~100m$230–$290
quarrySouth Pasture MineLithia36.9 mi73.8~100m$230–$290
sand pitCounty Line MineSpring Hill37.9 mi75.8~100m$230–$290
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Rate bands are FL tri-axle dump market (15–20 CY/load), conservative midpoint. Phase 2 will add Mapbox-routed actual drive distance + truck-type/fuel modifiers.

Contact Graph

Who's involved and how

Developer
HIGH POINT REAL ESTATE LLC

Permits & Sources

Every connector that's seen this project

Official source-of-truth portal
Hillsborough County Permits
Tampa area permits, inspections, reviews
ConnectorRecord IDCapturedLink
tampa_accelaUTL-26-00012992026-05-20Open ↗
hcpaHCPA_1357030022_ebc04da82026-05-21Open ↗

Parcel Detail

Hillsborough Property Appraiser

PropertyHCPA
Folio
1357030022
Strap
A-11-30-18-D88-000000-00006.0
Address
5211 S JULES VERNE CT, Tampa
Zip
33611-
Acreage
0.018 ac
Sq ft
788
Homestead
NO
5211 S JULES VERNE CT, Tampa
Owner of record
HIGH POINT REAL ESTATE LLC
Last sale
2025-10-30
$810,000

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
0 chars

/leads/ebc04da8