Leads/ea96655a
Approved · planning

Cornelius New Office

4650 Exploration Avenue, Lakeland, FL, 33812

~147loads
fill dirt
≤1 wk
Lifecycle
Permitted as of Mar 23, 2026
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

Cornelius New Office

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

⚡ Early signal — no contractor on record yet

The permit cleared on 3/23/2026 but no contractor shows on any filing — the haul work has likely not been awarded. Reaching the developer or engineer now beats bidding against a locked-in GC later.

Project value
No recorded value on file
Acreage
1.32 ac
Parcel 24-29-10-280562-000050
Est truck loads
Needs site plan parse
Sources seen
2
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant
Cornelius Welding, Inc
Why this is a hauling opportunity: Base unknown/other (20) | size signal: 1.3 ac disturbed, ~147 est. loads (+12) | stage=permit_issued, recent (+10)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-24SWFWMD_ERP
    Captured SWFWMD_ERP_932683 from swfwmd_erp
  2. 2026-05-24SWFWMD_ERP_PLANS
    Captured SWFWMD_PLANS_932683_ea96655a from swfwmd_erp_plans

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

Export ceiling
Fill volume
Net haul
Est loads
@ 15 cy/load
Max grading change9 ft
Utility trenches (each LF ≈ 1 cy spoil)
storm sewer
197 LF
Drainage features (8)
  • 1 ditch bottom inlet (DS-03
  • FDOT Type 'F')
  • 1 storm pipe (197 LF 8" SDR-35 PVC @ 1% min)
  • swales
  • 1 existing stormwater management system (permitted basin ERP #4421697.000
  • 32.0 AC)
  • roof drain downspouts connected to underground storm pipe
  • storm cleanouts
Plan notes: No earthwork cut/fill summary table is included in these construction drawings; grading quantities are not explicitly stated. The site drains to an existing permitted stormwater management system (SWFWMD ERP #4421697.000) covering 32.0 AC.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (quarry)
Four Corners · Lithia
One-way
15.8 mi
Round trip
31.6 mi
TypeNameCityOne-wayRT mi
quarryFour CornersLithia15.8 mi31.6
sand pitHaines City MineDavenport20.3 mi40.6
sand pitGator Sand MineBrooksville22.9 mi45.8
sand pitSILICA PLANTDavenport23.1 mi46.2
sand pitDavenport Sand MineBrooksville23.3 mi46.7
quarrySouth Pasture MineLithia23.4 mi46.9
quarryFLINT PLANTDavenport23.8 mi47.6
sand pitDiamond Sand PlantJacksonville24.0 mi48
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Developer
Cornelius Welding, Inc
Engineer of Record
Gadd & Associates, LLC
4685 E COUNTY ROAD 540A LAKELAND, FL 33813

Permits & Sources

Every connector that's seen this project

EARLY SIGNALWater District Environmental Permit (ERP)(SWFWMD ERP (Individual))

Required before ANY land can be disturbed — developers pull this months before hiring dirt contractors. An issued ERP means the project is real, engineered, and funded enough to permit, but the haul contract is usually still open. This is the earliest reliable signal in the lifecycle.

ConnectorRecord IDCapturedLink
swfwmd_erpSWFWMD_ERP_9326832026-05-24Open ↗
swfwmd_erp_plansSWFWMD_PLANS_932683_ea96655a2026-05-24Open ↗

Parcel Detail

Property records and ownership

Property
Parcel ID
24-29-10-280562-000050
City
Lakeland
Acreage
1.32 ac
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…