Cornelius New Office
4650 Exploration Avenue, Lakeland, FL, 33812
- Filed
- Permitted
- Active
- Completed
Approved / NOC filed / permit issued — ready to break ground
Location
The workspace from above — satellite by default
My Pipeline
Tag this lead — private to you, builds your bid history over time
Summary
Key numbers at a glance
The permit cleared on 3/23/2026 but no contractor shows on any filing — the haul work has likely not been awarded. Reaching the developer or engineer now beats bidding against a locked-in GC later.
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-24SWFWMD_ERPCaptured SWFWMD_ERP_932683 from swfwmd_erp
- 2026-05-24SWFWMD_ERP_PLANSCaptured SWFWMD_PLANS_932683_ea96655a from swfwmd_erp_plans
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
- 1 ditch bottom inlet (DS-03
- FDOT Type 'F')
- 1 storm pipe (197 LF 8" SDR-35 PVC @ 1% min)
- swales
- 1 existing stormwater management system (permitted basin ERP #4421697.000
- 32.0 AC)
- roof drain downspouts connected to underground storm pipe
- storm cleanouts
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | Four Corners | Lithia | 15.8 mi | 31.6 |
| sand pit | Haines City Mine | Davenport | 20.3 mi | 40.6 |
| sand pit | Gator Sand Mine | Brooksville | 22.9 mi | 45.8 |
| sand pit | SILICA PLANT | Davenport | 23.1 mi | 46.2 |
| sand pit | Davenport Sand Mine | Brooksville | 23.3 mi | 46.7 |
| quarry | South Pasture Mine | Lithia | 23.4 mi | 46.9 |
| quarry | FLINT PLANT | Davenport | 23.8 mi | 47.6 |
| sand pit | Diamond Sand Plant | Jacksonville | 24.0 mi | 48 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
Permits & Sources
Every connector that's seen this project
Required before ANY land can be disturbed — developers pull this months before hiring dirt contractors. An issued ERP means the project is real, engineered, and funded enough to permit, but the haul contract is usually still open. This is the earliest reliable signal in the lifecycle.
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| swfwmd_erp | SWFWMD_ERP_932683 | 2026-05-24 | Open ↗ |
| swfwmd_erp_plans | SWFWMD_PLANS_932683_ea96655a | 2026-05-24 | Open ↗ |
Parcel Detail
Property records and ownership
- Parcel ID
- 24-29-10-280562-000050
- City
- Lakeland
- Acreage
- 1.32 ac
Site Plan & Engineering
Linked documents
Bid Data
Who bid, who won
Activity & Notes
Your internal log
/leads/ea96655a