Approved · unknownWAKULLA County
Cleanup (petroleum cleanup) — HARVEY PROPERTY
3332 CRAWFORDVILLE HWY, CRAWFORDVILLE, FL, 32327
Load estimate pending
Lifecycle
Permitted as of Jul 5, 2026
- Filed
- Permitted
- Active
- Completed
Approved / NOC filed / permit issued — ready to break ground
Location
The workspace from above — satellite by default
Cleanup (petroleum cleanup) — HARVEY PROPERTY
My Pipeline
Tag this lead — private to you, builds your bid history over time
Loading pipeline status…
Summary
Key numbers at a glance
Project value
—
No recorded value on file
Acreage
—
Est truck loads
—
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor
Not yet identified
Developer / Applicant
Not yet identified
Why this is a hauling opportunity: FDEP petroleum cleanup site — active remediation status. Environmental data point, not an active construction lead; kept for enrichment/adjacency context only.
Lifecycle Timeline
Every signal we've seen, in order
- 2026-07-05FDEP_CLEANUP_SITESCaptured FDEP_CLEANUP_88184389 from fdep_cleanup_sites
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
Closest export sink (landfill)
MARPAN SUPPLY COMPANY INC · Tallahassee
One-way
15.0 mi
Round trip
30.1 mi
Closest import source (sand pit)
Silver Lake 1 · Tallahassee
One-way
17.6 mi
Round trip
35.3 mi
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| sand pit | Silver Lake 1 | Tallahassee | 17.6 mi | 35.3 |
| quarry | CYD Cabbage Grove | Daytona Beach | 24.7 mi | 49.3 |
| quarry | Perry Quarry | Fort Myers | 25.2 mi | 50.3 |
| sand pit | A-Mining Group II LLC. | Quincy | 26.6 mi | 53.3 |
| quarry | Active Minerals Attapulgite Division | Quincy | 30.7 mi | 61.4 |
| quarry | Quincy Plant and Mines | QUINCY | 32.0 mi | 64 |
| quarry | SRM Materials Cabbage Grove | Lamont | 47.8 mi | 95.6 |
| landfill | MARPAN SUPPLY COMPANY INC | Tallahassee | 15.0 mi | 30.1 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
No companies linked yet.
Permits & Sources
Every connector that's seen this project
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| fdep_cleanup_sites | FDEP_CLEANUP_88184389 | 2026-07-05 | Open ↗ |
Parcel Detail
Property records and ownership
Property
- County
- WAKULLA
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)
Site Plan & Engineering
Linked documents
No site plan documents yet. (PDF extraction connector pending.)
Bid Data
Who bid, who won
No bid data. (Public bid connectors pending.)
Activity & Notes
Your internal log
Loading notes…
Log call:
0 chars
/leads/ea809ce2