Leads/ea08ffb2
Approved · planning

YARD TRASH PROCESSING FACILITY

5617 CAUSEWAY BLVD, TAMPA, FL, 33619

Load estimate pending
Lifecycle
Permitted as of Feb 26, 2020
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

YARD TRASH PROCESSING FACILITY

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No cost signal yet
Acreage
Est truck loads
Needs site plan parse
Hauling revenue est
@ $120/load
General Contractor

Not yet identified

Developer / Applicant
DICK LAROSA
Why this is a hauling opportunity: Base unknown/other (20) | stage=permit_issued, but stale (6y old) | individual owner, residential scale — capped low

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-21FDEP_ERP
    Captured FDEP_ERP_0385198-001-EG from fdep_erp

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations — with haul rate suggestions

Closest import source (quarry)
Tampa Cement Grinding Plant · Tampa
One-way
3.3 mi
Round trip
6.6 mi · ~25 min
Rate / load
$85–$110
TypeNameCityOne-wayRT mi~CycleRate / load
quarryTampa Cement Grinding PlantTampa3.3 mi6.6~25m$85–$110
quarryCaloosa MaterialsRuskin15.4 mi30.8~75m$175–$230
quarryCentral State Aggregates LLCZephyrhill20.3 mi40.7~75m$175–$230
quarryFour CornersLithia27.9 mi55.7~100m$230–$290
quarryGeorgia Stone Spring Hill QuarryAtlanta 32.6 mi65.3~100m$230–$290
quarrySouth Pasture MineLithia33.1 mi66.2~100m$230–$290
quarryWingate Creek MineLithia33.5 mi66.9~100m$230–$290
sand pitCounty Line MineSpring Hill36.9 mi73.8~100m$230–$290
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Rate bands are FL tri-axle dump market (15–20 CY/load), conservative midpoint. Phase 2 will add Mapbox-routed actual drive distance + truck-type/fuel modifiers.

Contact Graph

Who's involved and how

Developer
DICK LAROSA

Permits & Sources

Every connector that's seen this project

ConnectorRecord IDCapturedLink
fdep_erpFDEP_ERP_0385198-001-EG2026-05-21Open ↗

Parcel Detail

Property records and ownership

Property
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
0 chars

/leads/ea08ffb2