Leads/e8ae64de
Approved · planning

CITY OF DUNEDIN

51 MAIN ST, DUNEDIN, FL, 34698

Load estimate pending
Lifecycle
Permitted as of Mar 14, 2014
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

CITY OF DUNEDIN

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No cost signal yet
Acreage
Est truck loads
Needs site plan parse
Hauling revenue est
@ $120/load
General Contractor

Not yet identified

Developer / Applicant
CITY OF DUNEDIN
Why this is a hauling opportunity: Base unknown/other (20) | stage=permit_issued, but stale (12y old) | government/public-authority project (floor 55) | unknown type, no size signal — capped <40

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-21FDEP_ERP
    Captured FDEP_ERP_0159258-009-EI from fdep_erp

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations — with haul rate suggestions

Closest import source (quarry)
Tampa Cement Grinding Plant · Tampa
One-way
22.1 mi
Round trip
44.2 mi · ~75 min
Rate / load
$175–$230
TypeNameCityOne-wayRT mi~CycleRate / load
quarryTampa Cement Grinding PlantTampa22.1 mi44.2~75m$175–$230
quarryCaloosa MaterialsRuskin30.4 mi60.7~100m$230–$290
quarryGeorgia Stone Spring Hill QuarryAtlanta 31.9 mi63.8~100m$230–$290
sand pitCounty Line MineSpring Hill32.2 mi64.3~100m$230–$290
quarryCentral State Aggregates LLCZephyrhill33.2 mi66.4~100m$230–$290
quarryBrooksville QuarryBrooksville44.9 mi89.9~130m$290–$370
quarryBrooksville South Cement PlantBrooksville45.6 mi91.3~130m$290–$370
quarryCalcium PlantJacksonville48.6 mi97.1~130m$290–$370
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Rate bands are FL tri-axle dump market (15–20 CY/load), conservative midpoint. Phase 2 will add Mapbox-routed actual drive distance + truck-type/fuel modifiers.

Contact Graph

Who's involved and how

Developer
CITY OF DUNEDIN

Permits & Sources

Every connector that's seen this project

ConnectorRecord IDCapturedLink
fdep_erpFDEP_ERP_0159258-009-EI2026-05-21Open ↗

Parcel Detail

Property records and ownership

Property
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
0 chars

/leads/e8ae64de