Leads/e733cbe0
Approved · unknownPASCO County

USACE 404 — 1250 WYNDHAM LAKES DR [DOCK]

1250 WYNDHAM LAKES DR, ODESSA, FL, 33556

~218loads
fill dirt + base rock
≤1 wk
Lifecycle
Permitted as of Apr 20, 2024
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

USACE 404 — 1250 WYNDHAM LAKES DR [DOCK]

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

⚡ Early signal — no contractor on record yet

The permit cleared on 4/20/2024 but no contractor shows on any filing — the haul work has likely not been awarded. Reaching the developer or engineer now beats bidding against a locked-in GC later.

Project value
No recorded value on file
Acreage
0.87 ac
Parcel 34-26-17-0070-00000-0450
Est truck loads
Needs site plan parse
Sources seen
2
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant
MADRIZ GUILLERMO &
Why this is a hauling opportunity: Base public_works/earthwork (65) | size signal: ~218 est. loads (+12) | homeowner-scale dock/seawall — capped low | individual owner, residential scale — capped low

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-28FDEP_SPGP
    Captured FDEP_SPGP_0447883-001-EE from fdep_spgp
  2. 2026-06-03PASCOPA
    Captured PASCOPA_34-26-17-0070-00000-0450_e733cbe0 from pascopa

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (quarry)
Georgia Stone Spring Hill Quarry · Atlanta
One-way
15.5 mi
Round trip
31.1 mi
TypeNameCityOne-wayRT mi
quarryGeorgia Stone Spring Hill QuarryAtlanta 15.5 mi31.1
quarryCentral State Aggregates LLCZephyrhill17.7 mi35.4
sand pitCounty Line MineSpring Hill17.6 mi35.3
quarryTampa Cement Grinding PlantTampa18.8 mi37.6
quarryBrooksville QuarryBrooksville29.3 mi58.6
quarryBrooksville South Cement PlantBrooksville29.9 mi59.7
quarryCalcium PlantJacksonville33.0 mi66.1
quarryCaloosa MaterialsRuskin33.9 mi67.9
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Developer
MADRIZ GUILLERMO &

Permits & Sources

Every connector that's seen this project

Official source-of-truth portal
Pasco County Permits
New Port Richey / Wesley Chapel Building
ConnectorRecord IDCapturedLink
fdep_spgpFDEP_SPGP_0447883-001-EE2026-05-28Open ↗
pascopaPASCOPA_34-26-17-0070-00000-0450_e733cbe02026-06-03Open ↗

Parcel Detail

Pasco County Property Appraiser

PropertyPASCOPA
Folio
34-26-17-0070-00000-0450
Strap
34-26-17-0070-00000-0450
Address
1250 WYNDHAM LAKES DRIVE, ODESSA
Zip
33556
Acreage
0.87 ac
Sq ft
37,897
Owner of record
MADRIZ GUILLERMO &
SALGADO ERICA
Last sale

No sale on record

Appraiser valuation
Just (market)
$974,666

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/e733cbe0