Approved · unknownMARION County
Cleanup (petroleum cleanup) — CIRCLE K #2723916
5201 S PINE AVE, OCALA, FL, 34480
Load estimate pending
Lifecycle
Active as of May 28, 2026
- Filed
- Permitted
- Active
- Completed
Construction underway — hauling demand peaks here
Location
The workspace from above — satellite by default
Cleanup (petroleum cleanup) — CIRCLE K #2723916
My Pipeline
Tag this lead — private to you, builds your bid history over time
Loading pipeline status…
Summary
Key numbers at a glance
Project value
—
No recorded value on file
Acreage
—
Parcel 35928-000-00
Est truck loads
—
Needs site plan parse
Sources seen
12
Public records referencing this job
Why this is a hauling opportunity: Base site_development/earthwork (65) | stage=under_construction, recent (+10) | individual owner, residential scale — capped low
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-28FDEP_CLEANUP_SITESCaptured FDEP_CLEANUP_87797393 from fdep_cleanup_sites
- 2026-06-01MARIONPACaptured MARIONPA_35928-000-00_e6301b93 from marionpa
- 2026-06-13FDEP_CLEANUP_SITESCaptured FDEP_CLEANUP_87950721 from fdep_cleanup_sites
- 2026-06-13MARIONPACaptured MARIONPA_35928-000-00_e04395d0 from marionpa
- 2026-06-16FDEP_CLEANUP_SITESCaptured FDEP_CLEANUP_87981371 from fdep_cleanup_sites
- 2026-06-19MARIONPACaptured MARIONPA_35928-000-00_161ff781 from marionpa
- 2026-06-23FDEP_CLEANUP_SITESCaptured FDEP_CLEANUP_88052819 from fdep_cleanup_sites
- 2026-06-24FDEP_CLEANUP_SITESCaptured FDEP_CLEANUP_88063020 from fdep_cleanup_sites
- 2026-06-24MARIONPACaptured MARIONPA_35928-000-00_570a2735 from marionpa
- 2026-06-24MARIONPACaptured MARIONPA_35928-000-00_b6806558 from marionpa
- 2026-06-28FDEP_CLEANUP_SITESCaptured FDEP_CLEANUP_88103816 from fdep_cleanup_sites
- 2026-06-28MARIONPACaptured MARIONPA_35928-000-00_7d7c6fc2 from marionpa
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
Closest import source (quarry)
NORTH MINE · OCALA
One-way
0.8 mi
Round trip
1.6 mi
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | NORTH MINE | OCALA | 0.8 mi | 1.6 |
| quarry | Stavola NW Pit | Ocala | 9.7 mi | 19.5 |
| sand pit | Lynne Mine | Davenport | 13.4 mi | 26.8 |
| quarry | Lowell Mine & Mill | Ocala | 13.8 mi | 27.6 |
| quarry | 328 Pit | Ocala | 16.1 mi | 32.1 |
| quarry | Reddick Mine | Pompano Beach | 16.7 mi | 33.4 |
| sand pit | Weirsdale Sand Plant | Jacksonville | 18.4 mi | 36.7 |
| quarry | Ocala Quarry | Atlanta | 18.7 mi | 37.5 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
Permits & Sources
Every connector that's seen this project
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| fdep_cleanup_sites | FDEP_CLEANUP_87797393 | 2026-05-28 | Open ↗ |
| marionpa | MARIONPA_35928-000-00_e6301b93 | 2026-06-01 | Open ↗ |
| fdep_cleanup_sites | FDEP_CLEANUP_87950721 | 2026-06-13 | Open ↗ |
| marionpa | MARIONPA_35928-000-00_e04395d0 | 2026-06-13 | Open ↗ |
| fdep_cleanup_sites | FDEP_CLEANUP_87981371 | 2026-06-16 | Open ↗ |
| marionpa | MARIONPA_35928-000-00_161ff781 | 2026-06-19 | Open ↗ |
| fdep_cleanup_sites | FDEP_CLEANUP_88052819 | 2026-06-23 | Open ↗ |
| fdep_cleanup_sites | FDEP_CLEANUP_88063020 | 2026-06-24 | Open ↗ |
| marionpa | MARIONPA_35928-000-00_570a2735 | 2026-06-24 | Open ↗ |
| marionpa | MARIONPA_35928-000-00_b6806558 | 2026-06-24 | Open ↗ |
| fdep_cleanup_sites | FDEP_CLEANUP_88103816 | 2026-06-28 | Open ↗ |
| marionpa | MARIONPA_35928-000-00_7d7c6fc2 | 2026-06-28 | Open ↗ |
Parcel Detail
Property records and ownership
Property
- Parcel ID
- 35928-000-00
- County
- MARION
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)
Site Plan & Engineering
Linked documents
No site plan documents yet. (PDF extraction connector pending.)
Bid Data
Who bid, who won
No bid data. (Public bid connectors pending.)
Activity & Notes
Your internal log
Loading notes…
Log call:
0 chars
/leads/e6301b93