Leads/e4db994c
Approved · unknown

CCCL — Single Family Dwelling (Bill and Tammy Hodges)

512 Gulf Pines Dr., Money Beach

Load estimate pending
Lifecycle
Permitted as of Jun 10, 2014
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

CCCL — Single Family Dwelling (Bill and Tammy Hodges)

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No cost signal yet
Acreage
Est truck loads
Needs site plan parse
Hauling revenue est
@ $120/load
General Contractor

Not yet identified

Developer / Applicant

Not yet identified

Why this is a hauling opportunity: Base site_development/earthwork (65) | stage=permit_issued, but stale (12y old) | individual owner, residential scale — capped low

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-28FDEP_CCCL
    Captured FDEP_CCCL_GU000588 from fdep_cccl

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations — with haul rate suggestions

Closest export sink (landfill)
FIVE POINTS CLASS III LANDFILL · Port St Joe
One-way
9.9 mi
Round trip
19.9 mi · ~40 min
Rate / load
$110–$140
Closest import source (quarry)
Honeyville Pit
One-way
25.6 mi
Round trip
51.2 mi · ~100 min
Rate / load
$230–$290
TypeNameCityOne-wayRT mi~CycleRate / load
landfillFIVE POINTS CLASS III LANDFILLPort St Joe9.9 mi19.9~40m$110–$140
transfer stationINDUSTRIAL ROAD TRANSFER STATIONPort St Joe10.5 mi21.1~55m$140–$175
transfer stationFRANKLIN COUNTY CENTRAL LANDFILLEastpoint28.5 mi57~100m$230–$290
landfillTRASH ROLLOFF OF BAY COUNTY INC. PITYoungstown44.9 mi89.7~130m$290–$370
landfill(unnamed)10.0 mi20~40m$110–$140
landfill(unnamed)10.5 mi21.1~55m$140–$175
landfill(unnamed)16.8 mi33.6~75m$175–$230
quarryHoneyville Pit25.6 mi51.2~100m$230–$290
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Rate bands are FL tri-axle dump market (15–20 CY/load), conservative midpoint. Phase 2 will add Mapbox-routed actual drive distance + truck-type/fuel modifiers.

Contact Graph

Who's involved and how

No companies linked yet.

Permits & Sources

Every connector that's seen this project

ConnectorRecord IDCapturedLink
fdep_ccclFDEP_CCCL_GU0005882026-05-28Open ↗

Parcel Detail

Property records and ownership

Property
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
0 chars

/leads/e4db994c