Approved · unknownMARION County
Cleanup (petroleum cleanup) — HESS STATION
2015 N PINE AVE, OCALA, FL, 34470
Load estimate pending
Lifecycle
Active as of May 28, 2026
- Filed
- Permitted
- Active
- Completed
Construction underway — hauling demand peaks here
Location
The workspace from above — satellite by default
Cleanup (petroleum cleanup) — HESS STATION
My Pipeline
Tag this lead — private to you, builds your bid history over time
Loading pipeline status…
Summary
Key numbers at a glance
Project value
—
No recorded value on file
Acreage
—
Parcel 25424-000-00
Est truck loads
—
Needs site plan parse
Sources seen
12
Public records referencing this job
General Contractor
Not yet identified
Why this is a hauling opportunity: Base site_development/earthwork (65) | stage=under_construction, recent (+10)
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-28FDEP_CLEANUP_SITESCaptured FDEP_CLEANUP_87797407 from fdep_cleanup_sites
- 2026-06-01MARIONPACaptured MARIONPA_25424-000-00_e38ae78e from marionpa
- 2026-06-13FDEP_CLEANUP_SITESCaptured FDEP_CLEANUP_87950735 from fdep_cleanup_sites
- 2026-06-13MARIONPACaptured MARIONPA_25424-000-00_32253db4 from marionpa
- 2026-06-16FDEP_CLEANUP_SITESCaptured FDEP_CLEANUP_87981385 from fdep_cleanup_sites
- 2026-06-19MARIONPACaptured MARIONPA_25424-000-00_78d56eb8 from marionpa
- 2026-06-23FDEP_CLEANUP_SITESCaptured FDEP_CLEANUP_88052833 from fdep_cleanup_sites
- 2026-06-24FDEP_CLEANUP_SITESCaptured FDEP_CLEANUP_88063034 from fdep_cleanup_sites
- 2026-06-24MARIONPACaptured MARIONPA_25424-000-00_0d62cc2c from marionpa
- 2026-06-24MARIONPACaptured MARIONPA_25424-000-00_9c5efbda from marionpa
- 2026-06-28FDEP_CLEANUP_SITESCaptured FDEP_CLEANUP_88103830 from fdep_cleanup_sites
- 2026-06-28MARIONPACaptured MARIONPA_25424-000-00_5e950baa from marionpa
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
Closest import source (quarry)
Stavola NW Pit · Ocala
One-way
4.4 mi
Round trip
8.8 mi
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | Stavola NW Pit | Ocala | 4.4 mi | 8.8 |
| quarry | NORTH MINE | OCALA | 6.0 mi | 12 |
| quarry | Lowell Mine & Mill | Ocala | 8.4 mi | 16.9 |
| quarry | Reddick Mine | Pompano Beach | 11.3 mi | 22.7 |
| quarry | Ocala Quarry | Atlanta | 13.4 mi | 26.8 |
| quarry | 328 Pit | Ocala | 13.6 mi | 27.2 |
| sand pit | Lynne Mine | Davenport | 14.6 mi | 29.2 |
| sand pit | Weirsdale Sand Plant | Jacksonville | 23.1 mi | 46.2 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
Permits & Sources
Every connector that's seen this project
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| fdep_cleanup_sites | FDEP_CLEANUP_87797407 | 2026-05-28 | Open ↗ |
| marionpa | MARIONPA_25424-000-00_e38ae78e | 2026-06-01 | Open ↗ |
| fdep_cleanup_sites | FDEP_CLEANUP_87950735 | 2026-06-13 | Open ↗ |
| marionpa | MARIONPA_25424-000-00_32253db4 | 2026-06-13 | Open ↗ |
| fdep_cleanup_sites | FDEP_CLEANUP_87981385 | 2026-06-16 | Open ↗ |
| marionpa | MARIONPA_25424-000-00_78d56eb8 | 2026-06-19 | Open ↗ |
| fdep_cleanup_sites | FDEP_CLEANUP_88052833 | 2026-06-23 | Open ↗ |
| fdep_cleanup_sites | FDEP_CLEANUP_88063034 | 2026-06-24 | Open ↗ |
| marionpa | MARIONPA_25424-000-00_0d62cc2c | 2026-06-24 | Open ↗ |
| marionpa | MARIONPA_25424-000-00_9c5efbda | 2026-06-24 | Open ↗ |
| fdep_cleanup_sites | FDEP_CLEANUP_88103830 | 2026-06-28 | Open ↗ |
| marionpa | MARIONPA_25424-000-00_5e950baa | 2026-06-28 | Open ↗ |
Parcel Detail
Property records and ownership
Property
- Parcel ID
- 25424-000-00
- County
- MARION
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)
Site Plan & Engineering
Linked documents
No site plan documents yet. (PDF extraction connector pending.)
Bid Data
Who bid, who won
No bid data. (Public bid connectors pending.)
Activity & Notes
Your internal log
Loading notes…
Log call:
0 chars
/leads/e38ae78e