Leads/e21dfb99
Approved · unknownFranklin County

FDOT — SR 300 CR 300 BEACH DR TO SR 30 (US 98/319) - RESURFACING

Franklin County — FDOT Contract E3Y09

Load estimate pending
Lifecycle
Completed as of Oct 16, 2025
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Job closed — historical reference only

Location

The workspace from above — satellite by default

FDOT — SR 300 CR 300 BEACH DR TO SR 30 (US 98/319) - RESURFACING

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
$1.6M
Actual — from source record
Acreage
Est truck loads
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant

Not yet identified

Why this is a hauling opportunity: FDOT roadway contract — SR 300 CR 300 BEACH DR TO SR 30 (US 98/319) - RESURFACING. Vendor: PIGOTT ASPHALT AND SITEWORK LLC. Cost: $1,554,686. | FDOT public project (+15) | size signal: $1,554,686 valuation (+12) | FDOT public project (+15) | size signal: $1,554,686 valuation (+12) | FDOT public project (+15) | size signal: $1,554,686 valuation (+12) | FDOT public project (+15) | size signal: $1,554,686 valuation (+12)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-28FDOT_ACTIVE
    Captured FDOT_ACTIVE_E3Y09_2 from fdot_active

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest export sink (transfer station)
FRANKLIN COUNTY CENTRAL LANDFILL · Eastpoint
One-way
6.5 mi
Round trip
13 mi
TypeNameCityOne-wayRT mi
transfer stationFRANKLIN COUNTY CENTRAL LANDFILLEastpoint6.5 mi13
landfillFIVE POINTS CLASS III LANDFILLPort St Joe24.6 mi49.2
transfer stationINDUSTRIAL ROAD TRANSFER STATIONPort St Joe25.9 mi51.7
landfill(unnamed)6.5 mi13
landfill(unnamed)8.3 mi16.7
landfill(unnamed)8.8 mi17.5
landfill(unnamed)24.6 mi49.3
landfill(unnamed)25.9 mi51.7
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

No companies linked yet.

Permits & Sources

Every connector that's seen this project

Official source-of-truth portal
Franklin County Permits
Carrabelle / Apalachicola Building
ConnectorRecord IDCapturedLink
fdot_activeFDOT_ACTIVE_E3Y09_22026-05-28Open ↗

Parcel Detail

Property records and ownership

Property
County
Franklin
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/e21dfb99