Leads/e1c0af59
Approved · planning

AP DOCK CVRD LIFT UNCVRD LIFT

4005 BAY OAKS CIR**, ENGLEWOOD, FL, 34223

Load estimate pending
Lifecycle
Permitted as of Feb 24, 2022
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

AP DOCK CVRD LIFT UNCVRD LIFT

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No cost signal yet
Acreage
Est truck loads
Needs site plan parse
Hauling revenue est
@ $120/load
General Contractor

Not yet identified

Developer / Applicant
BRICE FLOWER
Why this is a hauling opportunity: Base unknown/other (20) | homeowner-scale dock/seawall — capped low | individual owner, residential scale — capped low

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-24FDEP_ERP
    Captured FDEP_ERP_0190357-003-EI from fdep_erp

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations — with haul rate suggestions

Closest import source (quarry)
Florida Shell & Fill Company LLC · Naples
One-way
1.1 mi
Round trip
2.3 mi · ~25 min
Rate / load
$85–$110
TypeNameCityOne-wayRT mi~CycleRate / load
quarryFlorida Shell & Fill Company LLCNaples1.1 mi2.3~25m$85–$110
sand pitWashington Loop MinePunta Gorda25.9 mi51.7~100m$230–$290
quarryBermont Materials AlicoPunta Gorda26.9 mi53.7~100m$230–$290
quarry4M-31 MineAlva36.1 mi72.3~100m$230–$290
quarryHalls MineNaples36.4 mi72.8~100m$230–$290
sand pitWatermelon PitPunta Gorda37.8 mi75.6~100m$230–$290
quarryJayrockPunta Gorda37.8 mi75.7~100m$230–$290
quarryHighlands County Shell PitSebring37.9 mi75.8~100m$230–$290
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Rate bands are FL tri-axle dump market (15–20 CY/load), conservative midpoint. Phase 2 will add Mapbox-routed actual drive distance + truck-type/fuel modifiers.

Contact Graph

Who's involved and how

Developer
BRICE FLOWER

Permits & Sources

Every connector that's seen this project

ConnectorRecord IDCapturedLink
fdep_erpFDEP_ERP_0190357-003-EI2026-05-24Open ↗

Parcel Detail

Property records and ownership

Property
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
0 chars

/leads/e1c0af59