Approved · unknownSarasota County
FDOT — SR 45 (US 41) FROM LYCHEE RD TO BAY ST - PAVEMENT ONLY RESUR FACE (FLEX)
Sarasota County — FDOT Contract E1W93
Load estimate pending
Lifecycle
Active as of Aug 27, 2025
- Filed
- Permitted
- Active
- Completed
Construction underway — hauling demand peaks here
Location
The workspace from above — satellite by default
FDOT — SR 45 (US 41) FROM LYCHEE RD TO BAY ST - PAVEMENT ONLY RESUR FACE (FLEX)
My Pipeline
Tag this lead — private to you, builds your bid history over time
Loading pipeline status…
Summary
Key numbers at a glance
Project value
$5.4M
Actual — from source record
Acreage
—
Est truck loads
—
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor
Not yet identified
Developer / Applicant
Not yet identified
Why this is a hauling opportunity: FDOT roadway contract — SR 45 (US 41) FROM LYCHEE RD TO BAY ST - PAVEMENT ONLY RESUR FACE (FLEX). Vendor: PREFERRED MATERIALS INC.. Cost: $5,384,726. | FDOT public project (+15) | size signal: $5,384,726 valuation (+20) | stage=under_construction, recent (+10) | FDOT public project (+15) | size signal: $5,384,726 valuation (+20) | stage=under_construction, recent (+10) | FDOT public project (+15) | size signal: $5,384,726 valuation (+20) | stage=under_construction, recent (+10) | FDOT public project (+15) | size signal: $5,384,726 valuation (+20) | stage=under_construction, recent (+10)
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-28FDOT_ACTIVECaptured FDOT_ACTIVE_E1W93_1 from fdot_active
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
Closest import source (quarry)
Florida Shell & Fill Company LLC · Naples
One-way
18.2 mi
Round trip
36.4 mi
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | Florida Shell & Fill Company LLC | Naples | 18.2 mi | 36.4 |
| quarry | Wingate Creek Mine | Lithia | 31.1 mi | 62.2 |
| sand pit | Washington Loop Mine | Punta Gorda | 35.9 mi | 71.7 |
| quarry | Caloosa Materials | Ruskin | 36.2 mi | 72.4 |
| quarry | Bermont Materials Alico | Punta Gorda | 37.5 mi | 74.9 |
| quarry | 4M-31 Mine | Alva | 38.1 mi | 76.3 |
| sand pit | Watermelon Pit | Punta Gorda | 45.9 mi | 91.8 |
| quarry | South Pasture Mine | Lithia | 45.9 mi | 91.8 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
No companies linked yet.
Permits & Sources
Every connector that's seen this project
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| fdot_active | FDOT_ACTIVE_E1W93_1 | 2026-05-28 | Open ↗ |
Parcel Detail
Property records and ownership
Property
- County
- Sarasota
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)
Site Plan & Engineering
Linked documents
No site plan documents yet. (PDF extraction connector pending.)
Bid Data
Who bid, who won
No bid data. (Public bid connectors pending.)
Activity & Notes
Your internal log
Loading notes…
Log call:
0 chars
/leads/e1675d99