Leads/e14b2c86
Approved · unknown

CCCL — Vegetation, Native Salt Resist (Coastal CCCL owner)

FL coastal — CCCL -8015894

Load estimate pending
Lifecycle
Permitted as of Mar 31, 2003
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

CCCL — Vegetation, Native Salt Resist (Coastal CCCL owner)

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No cost signal yet
Acreage
Est truck loads
Needs site plan parse
Hauling revenue est
@ $120/load
General Contractor

Not yet identified

Developer / Applicant

Not yet identified

Why this is a hauling opportunity: Base site_development/earthwork (65) | stage=permit_issued, but stale (23y old)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-28FDEP_CCCL
    Captured FDEP_CCCL_-8015894 from fdep_cccl

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations — with haul rate suggestions

Closest export sink (landfill)
FIVE POINTS CLASS III LANDFILL · Port St Joe
One-way
10.9 mi
Round trip
21.9 mi · ~55 min
Rate / load
$140–$175
TypeNameCityOne-wayRT mi~CycleRate / load
landfillFIVE POINTS CLASS III LANDFILLPort St Joe10.9 mi21.9~55m$140–$175
transfer stationINDUSTRIAL ROAD TRANSFER STATIONPort St Joe11.3 mi22.6~55m$140–$175
transfer stationFRANKLIN COUNTY CENTRAL LANDFILLEastpoint30.9 mi61.8~100m$230–$290
landfillTRASH ROLLOFF OF BAY COUNTY INC. PITYoungstown44.7 mi89.4~130m$290–$370
transfer stationCOASTAL PARASAIL, INC. RECYCLING FACILITY (PREV BAY CO)Panama City Beach48.6 mi97.1~130m$290–$370
landfill(unnamed)11.0 mi22~55m$140–$175
landfill(unnamed)11.3 mi22.6~55m$140–$175
landfill(unnamed)19.2 mi38.4~75m$175–$230
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Rate bands are FL tri-axle dump market (15–20 CY/load), conservative midpoint. Phase 2 will add Mapbox-routed actual drive distance + truck-type/fuel modifiers.

Contact Graph

Who's involved and how

No companies linked yet.

Permits & Sources

Every connector that's seen this project

ConnectorRecord IDCapturedLink
fdep_ccclFDEP_CCCL_-80158942026-05-28Open ↗

Parcel Detail

Property records and ownership

Property
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
0 chars

/leads/e14b2c86