Leads/downtown-urban-ps-8-fl-ed35d3f1
Approved · unknown

DOWNTOWN URBAN PS-8

701 W LIVINGSTON ST, ORLANDO, FL, 32801

Load estimate pending
Lifecycle
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Job closed — historical reference only

Location

The workspace from above — satellite by default

DOWNTOWN URBAN PS-8

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No cost signal yet
Acreage
Est truck loads
Needs site plan parse
Hauling revenue est
@ $120/load
General Contractor

Not yet identified

Developer / Applicant
DOWNTOWN URBAN PS-8
Why this is a hauling opportunity: Base site_development/stormwater (40)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-21NPDES_STORMWATER
    Captured FLR20AQ07 from npdes_stormwater

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations — with haul rate suggestions

Closest import source (sand pit)
Center Sand Company · Clermont
One-way
18.3 mi
Round trip
36.6 mi · ~75 min
Rate / load
$175–$230
TypeNameCityOne-wayRT mi~CycleRate / load
sand pitCenter Sand CompanyClermont18.3 mi36.6~75m$175–$230
sand pitIndependent MineDavenport19.0 mi37.9~75m$175–$230
sand pitFour Corners Sand MineBrooksville19.3 mi38.6~75m$175–$230
sand pitHilochee Sand MineDavenport22.5 mi44.9~75m$175–$230
quarryS & L Materials IncKISSIMMEE23.1 mi46.3~75m$175–$230
sand pitAstatula Sand PlantJacksonville23.4 mi46.8~75m$175–$230
sand pitCypress SandLexington23.7 mi47.4~75m$175–$230
sand pitLake Sand PlantJacksonville23.8 mi47.5~75m$175–$230
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Rate bands are FL tri-axle dump market (15–20 CY/load), conservative midpoint. Phase 2 will add Mapbox-routed actual drive distance + truck-type/fuel modifiers.

Contact Graph

Who's involved and how

Developer
DOWNTOWN URBAN PS-8

Permits & Sources

Every connector that's seen this project

ConnectorRecord IDCapturedLink
npdes_stormwaterFLR20AQ072026-05-21Open ↗

Parcel Detail

Property records and ownership

Property
City
ORLANDO
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
0 chars

/leads/downtown-urban-ps-8-fl-ed35d3f1