Leads/denewland-silvia-chujandama-pizango-project-sarasota-county-sarasota-fl-ee3d6c16
Approved · unknownSarasota County

DENEWLAND SILVIA CHUJANDAMA PIZANGO project — Sarasota County

2025050941 TERMINATION

Load estimate pending
Lifecycle
Permitted as of Dec 2, 2025
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

DENEWLAND SILVIA CHUJANDAMA PIZANGO project — Sarasota County

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No recorded value on file
Acreage
Est truck loads
Needs site plan parse
Sources seen
2
Public records referencing this job
General Contractor
DENEWLAND SILVIA CHUJANDAMA PIZANGO
Developer / Applicant
NEWLAND LOWELL LEE
Why this is a hauling opportunity: NOC with no description — unknown scope | Connector base: 50 | Stage = permit_issued — actionable now (+10) | stage=permit_issued, recent (+10) | individual owner, residential scale — capped low | stage=permit_issued, recent (+10) | individual owner, residential scale — capped low | stage=permit_issued, recent (+10) | individual owner, residential scale — capped low

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-22SARASOTA_NOC
    Captured Sarasota_2025172627 from sarasota_noc
  2. 2026-05-22SARASOTA_NOC
    Captured Sarasota_2025172628 from sarasota_noc

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

No material sources within 50 mi. Coverage outside Florida is pending — see /material-sources.

Contact Graph

Who's involved and how

Developer
NEWLAND LOWELL LEE
Contractor
DENEWLAND SILVIA CHUJANDAMA PIZANGO
1 active project · Sarasota

Permits & Sources

Every connector that's seen this project

ACTIVENotice of Commencement (NOC)(Notice of Commencement)

Recorded with the county right before work physically starts, and it names the contractor. When this appears, trucks are weeks (or days) away — the haul contract is usually already let, so speed matters.

Official source-of-truth portal
Sarasota County Permits
Sarasota / Venice building permit search
ConnectorRecord IDCapturedLink
sarasota_nocSarasota_20251726272026-05-22Open ↗
sarasota_nocSarasota_20251726282026-05-22Open ↗

Parcel Detail

Property records and ownership

Property
County
Sarasota
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/denewland-silvia-chujandama-pizango-project-sarasota-county-sarasota-fl-ee3d6c16