Approved · unknownPASCO County
Cleanup (petroleum cleanup) — SHELL-HOLIDAY #120
2715 US HIGHWAY 19, HOLIDAY, FL, 34691
~240loads
fill dirt + base rock
2 wk
Lifecycle
Active as of May 28, 2026
- Filed
- Permitted
- Active
- Completed
Construction underway — hauling demand peaks here
Location
The workspace from above — satellite by default
Cleanup (petroleum cleanup) — SHELL-HOLIDAY #120
My Pipeline
Tag this lead — private to you, builds your bid history over time
Loading pipeline status…
Summary
Key numbers at a glance
Project value
—
No recorded value on file
Acreage
0.96 ac
Parcel 30-26-16-0010-02500-0010
Est truck loads
—
Needs site plan parse
Sources seen
12
Public records referencing this job
Why this is a hauling opportunity: Base site_development/earthwork (65) | size signal: ~240 est. loads (+12) | stage=under_construction, recent (+10)
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-28FDEP_CLEANUP_SITESCaptured FDEP_CLEANUP_87800167 from fdep_cleanup_sites
- 2026-06-03PASCOPACaptured PASCOPA_30-26-16-0010-02500-0010_de8541da from pascopa
- 2026-06-10FDEP_CLEANUP_SITESCaptured FDEP_CLEANUP_87922840 from fdep_cleanup_sites
- 2026-06-11PASCOPACaptured PASCOPA_30-26-16-0010-02500-0010_da69d49e from pascopa
- 2026-06-11FDEP_CLEANUP_SITESCaptured FDEP_CLEANUP_87943277 from fdep_cleanup_sites
- 2026-06-12PASCOPACaptured PASCOPA_30-26-16-0010-02500-0010_054055c9 from pascopa
- 2026-06-15FDEP_CLEANUP_SITESCaptured FDEP_CLEANUP_87984142 from fdep_cleanup_sites
- 2026-06-19PASCOPACaptured PASCOPA_30-26-16-0010-02500-0010_feb7b77c from pascopa
- 2026-06-23FDEP_CLEANUP_SITESCaptured FDEP_CLEANUP_88055585 from fdep_cleanup_sites
- 2026-06-23PASCOPACaptured PASCOPA_30-26-16-0010-02500-0010_e8209506 from pascopa
- 2026-06-25FDEP_CLEANUP_SITESCaptured FDEP_CLEANUP_88086185 from fdep_cleanup_sites
- 2026-06-26PASCOPACaptured PASCOPA_30-26-16-0010-02500-0010_94cfe387 from pascopa
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
Closest import source (sand pit)
County Line Mine · Spring Hill
One-way
19.3 mi
Round trip
38.5 mi
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| sand pit | County Line Mine | Spring Hill | 19.3 mi | 38.5 |
| quarry | Georgia Stone Spring Hill Quarry | Atlanta | 20.1 mi | 40.2 |
| quarry | Tampa Cement Grinding Plant | Tampa | 25.7 mi | 51.3 |
| quarry | Central State Aggregates LLC | Zephyrhill | 27.1 mi | 54.3 |
| quarry | Brooksville Quarry | Brooksville | 32.2 mi | 64.4 |
| quarry | Brooksville South Cement Plant | Brooksville | 33.0 mi | 66 |
| quarry | Calcium Plant | Jacksonville | 35.7 mi | 71.5 |
| quarry | Caloosa Materials | Ruskin | 38.8 mi | 77.6 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
Permits & Sources
Every connector that's seen this project
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| fdep_cleanup_sites | FDEP_CLEANUP_87800167 | 2026-05-28 | Open ↗ |
| pascopa | PASCOPA_30-26-16-0010-02500-0010_de8541da | 2026-06-03 | Open ↗ |
| fdep_cleanup_sites | FDEP_CLEANUP_87922840 | 2026-06-10 | Open ↗ |
| pascopa | PASCOPA_30-26-16-0010-02500-0010_da69d49e | 2026-06-11 | Open ↗ |
| fdep_cleanup_sites | FDEP_CLEANUP_87943277 | 2026-06-11 | Open ↗ |
| pascopa | PASCOPA_30-26-16-0010-02500-0010_054055c9 | 2026-06-12 | Open ↗ |
| fdep_cleanup_sites | FDEP_CLEANUP_87984142 | 2026-06-15 | Open ↗ |
| pascopa | PASCOPA_30-26-16-0010-02500-0010_feb7b77c | 2026-06-19 | Open ↗ |
| fdep_cleanup_sites | FDEP_CLEANUP_88055585 | 2026-06-23 | Open ↗ |
| pascopa | PASCOPA_30-26-16-0010-02500-0010_e8209506 | 2026-06-23 | Open ↗ |
| fdep_cleanup_sites | FDEP_CLEANUP_88086185 | 2026-06-25 | Open ↗ |
| pascopa | PASCOPA_30-26-16-0010-02500-0010_94cfe387 | 2026-06-26 | Open ↗ |
Parcel Detail
Pasco County Property Appraiser
PropertyPASCOPA ↗
- Folio
- 30-26-16-0010-02500-0010
- Strap
- 30-26-16-0010-02500-0010
- Address
- 2715 US HIGHWAY 19, HOLIDAY
- Zip
- 34691
- Acreage
- 0.96 ac
- Sq ft
- 41,818
Owner of record
HEAVENLY GROUP INC
Last sale
No sale on record
Appraiser valuation
- Just (market)
- $498,788
Site Plan & Engineering
Linked documents
No site plan documents yet. (PDF extraction connector pending.)
Bid Data
Who bid, who won
No bid data. (Public bid connectors pending.)
Activity & Notes
Your internal log
Loading notes…
Log call:
0 chars
/leads/de8541da