CCCL — CCCL coastal construction (Coastal CCCL owner)
3615 S Atlantic Ave DBS
- Filed
- Permitted
- Active
- Completed
Approved / NOC filed / permit issued — ready to break ground
Location
The workspace from above — satellite by default
My Pipeline
Tag this lead — private to you, builds your bid history over time
Summary
Key numbers at a glance
The permit cleared on 4/18/2025 but no contractor shows on any filing — the haul work has likely not been awarded. Reaching the developer or engineer now beats bidding against a locked-in GC later.
Not yet identified
Not yet identified
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-28FDEP_CCCLCaptured FDEP_CCCL_-8046168 from fdep_cccl
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | Beeline Mine | Orlando | 44.3 mi | 88.6 |
| quarry | S & L Materials Inc | KISSIMMEE | 47.2 mi | 94.4 |
| quarry | Rock Solid Rock, LLC | Titusville | 47.7 mi | 95.5 |
| landfill | TOMOKA FARMS ROAD LANDFILL | Port Orange | 7.6 mi | 15.2 |
| transfer station | CITY OF EDGEWATER SOLID WASTE TRANSFER STATION | Edgewater | 11.6 mi | 23.3 |
| transfer station | ORMOND BEACH TRANSFER STATION | Ormond Beach | 11.8 mi | 23.6 |
| landfill | SAMSULA LANDFILL | New Smyrna Beach | 12.5 mi | 25.1 |
| landfill | 4 JAYS LANDFILL, LLC | New Smyrna Beach | 12.9 mi | 25.8 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
Permits & Sources
Every connector that's seen this project
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| fdep_cccl | FDEP_CCCL_-8046168 | 2026-05-28 | Open ↗ |
Parcel Detail
Property records and ownership
Site Plan & Engineering
Linked documents
Bid Data
Who bid, who won
Activity & Notes
Your internal log
/leads/dd020bb1