Leads/db78f042
Approved · planning

HELLAS DOCK

307 ROOSEVELT BLVD, TARPON SPRINGS, FL, 34689

Load estimate pending
Lifecycle
Permitted as of Apr 9, 2020
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

HELLAS DOCK

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No cost signal yet
Acreage
Est truck loads
Needs site plan parse
Hauling revenue est
@ $120/load
General Contractor

Not yet identified

Developer / Applicant
KARTES, BOB INTER VIVOS TRUST
Why this is a hauling opportunity: Base unknown/other (20) | stage=permit_issued, but stale (6y old)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-21FDEP_ERP
    Captured FDEP_ERP_0385556-001-EI from fdep_erp

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations — with haul rate suggestions

Closest import source (sand pit)
County Line Mine · Spring Hill
One-way
22.7 mi
Round trip
45.3 mi · ~75 min
Rate / load
$175–$230
TypeNameCityOne-wayRT mi~CycleRate / load
sand pitCounty Line MineSpring Hill22.7 mi45.3~75m$175–$230
quarryGeorgia Stone Spring Hill QuarryAtlanta 23.2 mi46.4~75m$175–$230
quarryTampa Cement Grinding PlantTampa24.5 mi49~75m$175–$230
quarryCentral State Aggregates LLCZephyrhill28.6 mi57.3~100m$230–$290
quarryBrooksville QuarryBrooksville35.6 mi71.2~100m$230–$290
quarryBrooksville South Cement PlantBrooksville36.3 mi72.7~100m$230–$290
quarryCaloosa MaterialsRuskin36.7 mi73.3~100m$230–$290
quarryCalcium PlantJacksonville39.1 mi78.3~100m$230–$290
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Rate bands are FL tri-axle dump market (15–20 CY/load), conservative midpoint. Phase 2 will add Mapbox-routed actual drive distance + truck-type/fuel modifiers.

Contact Graph

Who's involved and how

Developer
KARTES, BOB INTER VIVOS TRUST

Permits & Sources

Every connector that's seen this project

ConnectorRecord IDCapturedLink
fdep_erpFDEP_ERP_0385556-001-EI2026-05-21Open ↗

Parcel Detail

Property records and ownership

Property
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
0 chars

/leads/db78f042