Leads/db7814c7
Approved · unknown

Asphalt Plant — MARTIN ASPHALT COMPANY

WEST SIDE OF US 1, OAK HILL, FL, 32710

Load estimate pending
Lifecycle
Completed as of Jun 1, 1993
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Job closed — historical reference only

Location

The workspace from above — satellite by default

Asphalt Plant — MARTIN ASPHALT COMPANY

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No recorded value on file
Acreage
Est truck loads
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant

Not yet identified

Why this is a hauling opportunity: Base unknown/other (20)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-28FDEP_ARMS_FACILITIES
    Captured FDEP_ARMS_1270064 from fdep_arms_facilities

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest export sink (transfer station)
CITY OF EDGEWATER SOLID WASTE TRANSFER STATION · Edgewater
One-way
12.2 mi
Round trip
24.3 mi
Closest import source (quarry)
Beeline Mine · Orlando
One-way
22.6 mi
Round trip
45.2 mi
TypeNameCityOne-wayRT mi
quarryBeeline MineOrlando22.6 mi45.2
quarryRock Solid Rock, LLCTitusville24.0 mi48.1
quarryS & L Materials IncKISSIMMEE25.8 mi51.6
transfer stationCITY OF EDGEWATER SOLID WASTE TRANSFER STATIONEdgewater12.2 mi24.3
transfer stationOSCEOLA RD SOLID WASTE MGMT FACILITY-CLASS I LANDFILLGeneva13.4 mi26.8
landfill4 JAYS LANDFILL, LLCNew Smyrna Beach17.1 mi34.2
landfillSAMSULA LANDFILLNew Smyrna Beach17.2 mi34.4
transfer stationTITUSVILLE TRANSFER STATIONTitusville17.2 mi34.5
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

No companies linked yet.

Permits & Sources

Every connector that's seen this project

ConnectorRecord IDCapturedLink
fdep_arms_facilitiesFDEP_ARMS_12700642026-05-28Open ↗

Parcel Detail

Property records and ownership

Property
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/db7814c7