Leads/da37866d
Approved · unknown

CCCL — Subgrade Utilities (e.g. Septi (Coastal CCCL owner)

7650 Estero Blvd, Ft. Myers Beach

Load estimate pending
Lifecycle
Permitted as of Jul 20, 1995
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

CCCL — Subgrade Utilities (e.g. Septi (Coastal CCCL owner)

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No cost signal yet
Acreage
Est truck loads
Needs site plan parse
Hauling revenue est
@ $120/load
General Contractor

Not yet identified

Developer / Applicant

Not yet identified

Why this is a hauling opportunity: Base site_development/earthwork (65) | earthwork keywords (+25) | stage=permit_issued, but stale (30y old)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-28FDEP_CCCL
    Captured FDEP_CCCL_-8006340 from fdep_cccl

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations — with haul rate suggestions

Closest import source (quarry)
ALICO ROAD QUARRY · Miami
One-way
10.8 mi
Round trip
21.6 mi · ~55 min
Rate / load
$140–$175
TypeNameCityOne-wayRT mi~CycleRate / load
quarryALICO ROAD QUARRYMiami10.8 mi21.6~55m$140–$175
quarryFort Myers QuarryFort Myers12.5 mi25~55m$140–$175
quarryFort Myers MineJacksonville12.5 mi25~55m$140–$175
sand pitCorkscrewEstero19.1 mi38.2~75m$175–$230
quarryBell MineFort Myers19.8 mi39.5~75m$175–$230
sand pit846 Mine LLCNaples20.6 mi41.2~75m$175–$230
quarryGolden Gate QuarryDaytona Beach, FL22.0 mi43.9~75m$175–$230
sand pitImmokalee DivisionJupiter27.8 mi55.5~100m$230–$290
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Rate bands are FL tri-axle dump market (15–20 CY/load), conservative midpoint. Phase 2 will add Mapbox-routed actual drive distance + truck-type/fuel modifiers.

Contact Graph

Who's involved and how

No companies linked yet.

Permits & Sources

Every connector that's seen this project

ConnectorRecord IDCapturedLink
fdep_ccclFDEP_CCCL_-80063402026-05-28Open ↗

Parcel Detail

Property records and ownership

Property
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
0 chars

/leads/da37866d