Leads/d8dfb525
Approved · unknownOrange County

FDOT — TSM&O WESTERN BELTWAY (SR429)/US192 INTERCHANGE SB OFF-RAMP (MP5.5) - INTERCHANGE IMPROVEMENT

Orange County — FDOT Contract E8V68

Load estimate pending
Lifecycle
Active as of Jul 14, 2025
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Construction underway — hauling demand peaks here

Location

The workspace from above — satellite by default

FDOT — TSM&O WESTERN BELTWAY (SR429)/US192 INTERCHANGE SB OFF-RAMP (MP5.5) - INTERCHANGE IMPROVEMENT

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
$14.7M
Actual — from source record
Acreage
Est truck loads
Needs site plan parse
Hauling revenue est
@ $120/load
General Contractor

Not yet identified

Developer / Applicant

Not yet identified

Why this is a hauling opportunity: FDOT earthwork contract — TSM&O WESTERN BELTWAY (SR429)/US192 INTERCHANGE SB OFF-RAMP (MP5.5) - INTERCHANG. Vendor: SOUTHLAND CONSTRUCTION, INC.. Cost: $14,691,420. | FDOT public project (+15) | size signal: $14,691,420 valuation (+20) | stage=under_construction, recent (+10) | FDOT public project (+15) | size signal: $14,691,420 valuation (+20) | stage=under_construction, recent (+10) | FDOT public project (+15) | size signal: $14,691,420 valuation (+20) | stage=under_construction, recent (+10)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-28FDOT_ACTIVE
    Captured FDOT_ACTIVE_E8V68_1 from fdot_active

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations — with haul rate suggestions

Closest import source (sand pit)
Cypress Sand · Lexington
One-way
4.8 mi
Round trip
9.5 mi · ~25 min
Rate / load
$85–$110
TypeNameCityOne-wayRT mi~CycleRate / load
sand pitCypress SandLexington4.8 mi9.5~25m$85–$110
sand pitHilochee Sand MineDavenport5.4 mi10.7~40m$110–$140
sand pitGreen Bay MineDavenport6.9 mi13.9~40m$110–$140
sand pitFour Corners Sand MineBrooksville7.8 mi15.6~40m$110–$140
sand pitGator Sand MineBrooksville8.0 mi15.9~40m$110–$140
sand pitLake Sand PlantJacksonville8.7 mi17.3~40m$110–$140
sand pit474 Sand MineBrooksville8.9 mi17.7~40m$110–$140
quarryFLINT PLANTDavenport11.1 mi22.1~55m$140–$175
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Rate bands are FL tri-axle dump market (15–20 CY/load), conservative midpoint. Phase 2 will add Mapbox-routed actual drive distance + truck-type/fuel modifiers.

Contact Graph

Who's involved and how

No companies linked yet.

Permits & Sources

Every connector that's seen this project

Official source-of-truth portal
Orange County Permits
Orlando area building permit search
ConnectorRecord IDCapturedLink
fdot_activeFDOT_ACTIVE_E8V68_12026-05-28Open ↗

Parcel Detail

Property records and ownership

Property
County
Orange
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
0 chars

/leads/d8dfb525