Leads/d8cbf935
Approved · unknownSARASOTA County

USACE 404 — DOLANSKY, JOHN / 0796010620

9046 ALLAPATA LN, VENICE, FL, 34293

Load estimate pending
Lifecycle
Permitted as of Apr 30, 2026
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

USACE 404 — DOLANSKY, JOHN / 0796010620

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No cost signal yet
Acreage
Est truck loads
Needs site plan parse
Hauling revenue est
@ $120/load
General Contractor

Not yet identified

Developer / Applicant

Not yet identified

Why this is a hauling opportunity: Base public_works/earthwork (65) | stage=permit_issued, recent (+10) | homeowner-scale dock/seawall — capped low | individual owner, residential scale — capped low

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-28FDEP_SPGP
    Captured FDEP_SPGP_0470707-001-EE from fdep_spgp

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations — with haul rate suggestions

Closest import source (quarry)
Florida Shell & Fill Company LLC · Naples
One-way
7.1 mi
Round trip
14.3 mi · ~40 min
Rate / load
$110–$140
TypeNameCityOne-wayRT mi~CycleRate / load
quarryFlorida Shell & Fill Company LLCNaples7.1 mi14.3~40m$110–$140
sand pitWashington Loop MinePunta Gorda20.5 mi41.1~75m$175–$230
quarryBermont Materials AlicoPunta Gorda21.9 mi43.8~75m$175–$230
quarry4M-31 MineAlva28.5 mi57~100m$230–$290
quarryHalls MineNaples31.2 mi62.4~100m$230–$290
sand pitWatermelon PitPunta Gorda31.8 mi63.7~100m$230–$290
quarryHighlands County Shell PitSebring32.3 mi64.7~100m$230–$290
quarryWright Farms PitNocatee32.4 mi64.8~100m$230–$290
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Rate bands are FL tri-axle dump market (15–20 CY/load), conservative midpoint. Phase 2 will add Mapbox-routed actual drive distance + truck-type/fuel modifiers.

Contact Graph

Who's involved and how

No companies linked yet.

Permits & Sources

Every connector that's seen this project

Official source-of-truth portal
Sarasota County Permits
Sarasota / Venice building permit search
ConnectorRecord IDCapturedLink
fdep_spgpFDEP_SPGP_0470707-001-EE2026-05-28Open ↗

Parcel Detail

Property records and ownership

Property
County
SARASOTA
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
0 chars

/leads/d8cbf935